The power-up sequence decides whether the machine reaches a normal running state in one go, and the inrush current decides whether the switching supply and the breaker trip the instant you close the switch. Get the sequence wrong and the usual result is a supply protection trip and a PLC that keeps restarting; leave inrush alone and a bigger supply only postpones the problem. The sections below cover the order, where the current comes from, and how to tame it.
A system contains low-voltage control supplies, a high-voltage main circuit and devices that need a communication handshake. If the main circuit is energised first and the control supply arrives afterwards, actuators can move before the controller is ready. If individual devices come up before the controller, the communication handshake may never complete. The rule is to establish control and communication first and bring in the power afterwards, so that the state of the machine is predictable at every moment.
The usual order runs like this. Energise the control circuit supply first and let the PLC complete self-test and reach RUN. Then supply the sensors and communication devices and confirm the stations are online. Then energise the control supply of the drives, the VFDs and servo drives, so they come to standby. Finally close the main circuit and let the motors and loads take power. Shutdown is roughly the reverse: drop the main circuit first, wait until the mechanism has stopped, then remove drive and sensor supplies, and take the control supply last. A delay relay or the PLC's own power-up delay will enforce the order automatically.
Inrush has three main sources. The first is the magnetising surge when a switching supply or transformer is energised, where a saturated core briefly draws several to a dozen times rated current. The second is charging a large DC-link capacitance, which momentarily looks almost like a short circuit. The third is surge currents adding up when several devices are energised at the same instant. Where a supply has power factor correction, its start-up behaviour can concentrate the surge further. The surge lasts only briefly, but long enough to trip an upstream breaker or blow a fuse.
Several measures are common. An NTC thermistor limits the closing current when cold, then drops in resistance as it warms. A limiting resistor with a bypass relay limits at start-up and is bypassed once settled. A switching supply with soft start or current limiting can be specified instead. Staggered power-up uses sequencing delays to separate the surges. A reactor can be added where needed. Each has a cost: resistors and thermistors introduce a voltage drop, a soft-start supply costs more, and staggering calls for extra timing control.
Powering down is not simply the start-up order reversed. Two things matter. Any mechanism with a braking or holding requirement must be brought to a stop by the servo before the power is removed, otherwise it can run away. A controller that needs data retained should not lose its control supply until the shutdown write has finished. After a brief loss and restore of supply, for instance a voltage dip, confirm that the automatic restart strategy meets the safety requirement rather than assuming the machine will simply carry on.
| Stage | Power-up order | Power-down order | Main measure |
|---|---|---|---|
| Control circuit supply | Closed first | Opened last | Dedicated supply with filtering |
| PLC CPU | Self-test to RUN after control supply | Cut only after data is written | Set power-up delay and start mode |
| Sensors and 24 V | Applied once the PLC is in RUN | Removed after the mechanism stops | Total the 24 V current |
| Communication devices | With the sensors, confirm online | Same order as the control supply | Online scan after power-up |
| VFD control supply | To standby before closing the main circuit | Main circuit first, then control | No direct closing under load |
| Servo drive | Check home and limits before enabling | Stop first, then remove power | Never remove power while enabled |
| Main circuit power | Closed last | Opened first | Breaker with instantaneous trip margin |
| Supply inrush | Surge peaks at closing | Discharge takes time | Limiting, soft start or staggering |
| DC-link charging | Transient charge, near short circuit | Needs a discharge path | Limiting resistor with bypass relay |
| Restart after a voltage dip | Decide recovery per strategy | Confirm mechanism position is safe | No unconditional auto-restart |
The practical way to fix the sequence is to draw a power-up timing chart first, marking the instant each stage is energised, what it depends on and the delay involved, and then select breaker and supply ratings from that chart. Inrush must be estimated at the least favourable instant, that is, with every device possibly energised at once, rather than selected from steady-state current. Where space and cost allow, the simplest arrangement is to feed the control supply and the power circuit from two separate switches, and let the control side's timing enforce the order.
General rules for low-voltage switchgear and controlgear follow GB 14048.1 (IEC 60947-1). Electrical installation, protection and earthing of the assembled equipment follow GB 5226.1 and IEC 60204-1. Requirements for adjustable-speed electrical drive systems follow the GB/T 12668 series. Breaker trip characteristics and supply inrush figures are as stated in the device manuals; the items listed here illustrate the accounting method.
Before closing or opening the supply, confirm that no one is working on the machine and that guards are back in place. Live measurement should be carried out by competent persons using suitable insulation protection.