MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › How do you set up networking between multiple Mitsubishi PLCs?
HomeModels
Table of contents

On this page

PLC & Programming (100 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

How do you set up networking between multiple Mitsubishi PLCs?

For multi-Mitsubishi-PLC networks there are three common routes: FX5U / iQ-R controllers use their built-in Ethernet port to run CC-Link IE Field Basic, FX3U systems add a CC-Link master module to run classic CC-Link, or any model can be polled over Ethernet with the SLMP protocol. The sections below walk through choosing the network, configuring the stations and organising the refresh areas.

1. Choosing the network first: where each method fits

MethodSuitable modelsMediumCharacter
CC-Link IE Field BasicFX5U, iQ-R built-in EthernetOrdinary Ethernet cableCyclic communication, no special hardware, fine for small node counts
CC-Link (fieldbus)FX3U with FX3U-16CCL-M etc.Dedicated twisted pairGood noise immunity, tidy station expansion, common on older lines
Ethernet SLMP / MC protocolNearly all seriesEthernet cableMaster polling with program-driven exchange, flexible but costs code

For new projects prefer CC-Link IE Field Basic: the cable is cheap, configuration is simple and cyclic refreshing needs no communication program. Keep CC-Link on legacy lines; for a one- or two-machine data roll-up, SLMP polling is the cheapest route.

2. Configuring CC-Link IE Field Basic in GX Works3

Step by step: ① Navigation window → Parameter → FX5UCPU → Module Parameter → Ethernet; ② in the basic settings select "CC-Link IE Field Basic" and set this station as the control station (master) or a normal station; ③ set each slave's station number and refresh device start (e.g. W0, W100, one block per station); ④ configure every slave PLC the same way as a normal station with the same network number; ⑤ download the parameters to each PLC and restart.

Key points: all stations must share the same network number, and the refresh device ranges must not overlap. Give the master W0~W1F to station 1's inputs, draw up a refresh table and paste it into the program so that who writes and who reads is obvious at a glance.

3. Configuration points for CC-Link (FX3U + 16CCL-M)

The master module occupies X/Y points and buffer memory, and the station information is written into the parameters (G0~G2 and so on): the total number of stations and the station count each slave occupies (1, 2 or 4 stations, which decides the 32/64-point refresh volume). The remote inputs RX and remote outputs RY are mapped into local devices via FROM/TO instructions or auto refresh. The line uses DA-DB twisted shielded pair with terminating resistors at both ends — a missing terminating resistor is the most common cause of "every station offline".

4. Designing the refresh table

StationRefresh devices (inputs)Refresh devices (outputs)Suggested content
MasterW0~W1FW100~W11FCommand words the master sends out
Station 1W20~W3FW120~W13FStatus, production count, alarm word
Station 2W40~W5FW140~W15FSame as above
Station 3W60~W7FW160~W17FSame as above
ReservedW80~W9FW180~W19FKeep one or two stations for expansion

Give every station a heartbeat word (say W20 incrementing continuously); if the master sees the heartbeat stop, it declares that station offline. This is far more reliable than noticing "the data suddenly went all zeros".

5. The SLMP polling approach

The master sends soft-element read/write requests to each station's IP in turn using one-shot instructions or a communication library, polling station by station; each exchange gets a timeout with retries, and N consecutive timeouts declares the station offline. The advantage is that an ordinary switch is enough and routing across segments works; the drawback is that real-time behaviour degrades as the station count grows, so it does not suit tightly synchronised interlocks.

6. Checklist before and after commissioning the network

ItemWhat to verifyCommon mistake
Network / station numbersUnique and consistent across the networkTwo controllers both set as control station, network never starts
IP addressesSame subnet, no conflictsClashing with the plant network and being routed away
Refresh devicesNo overlap between stationsOverlapping ranges overwrite each other's data
CablingCat5e or better; CC-Link terminating resistors fittedMissing terminators, all stations offline
Heartbeat monitoringHeartbeat word per station + master timeout detectionNo heartbeat, a dropped station freezes stale data unnoticed
Shield earthingShield earthed at one endVFD noise causes intermittent comms errors
Download orderSlaves first, master lastMaster starts first, reports slaves offline, hardware blamed in error
DocumentationRefresh table and IP list archived in the panelSix months later nobody remembers which block belongs to whom

7. Notes

At its heart, networking means "sharing a region of devices both sides agree on": whatever the method, machine A's data is periodically moved to an agreed address and machine B reads from that address. Get the refresh table right and changing the protocol is just changing the vehicle that does the moving.

8. References

Configuration follows the Mitsubishi MELSEC iQ-F FX5 User's Manual (CC-Link IE Field Basic) and the CC-Link System Master Module User's Manual; electrical installation and earthing follow GB 5226.1 (equivalent to IEC 60204-1). Station and refresh limits follow the current revision of each manual.

9. Cautions

⚠️ Three traps to avoid:
① Overlapping refresh ranges — one station's data is silently altered and no search of the program finds it;
② Terminating resistors missing or fitted mid-line on CC-Link, giving intermittent communication;
③ Sharing one switch between office and control traffic — a laptop copying files wrecks real-time communication.

During commissioning, get every station's heartbeat and offline alarm working before linking any actions; a printed network diagram and refresh table taped inside the panel is the most valuable sheet of paper for later maintenance.

Related reading

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Electrical Knowledge Base · free self-study reference for electrical & automation engineers, 3D CAD models at MOULDL