XL-series expansion (digital stacking, analog/temperature modules, CANLink remote expansion) follows rules that are simple but each one is a hard limit beyond which "weird faults" appear: total points, module count, address allocation, power budget and cable length. Checking these into the drawings at design time beats chasing strange symptoms during commissioning. The sections below cover local and remote expansion.
| Rule | Content | Consequence if exceeded |
|---|---|---|
| Module count | Stacked directly right of the base unit, count capped per catalogue | Not recognised or communication errors |
| Total I/O points | Base + all expansions capped | Modules beyond the cap do not work |
| Address allocation | Continuous, automatic, by stacking order | Inserting a module mid-train shifts every later address |
| Power budget | Base/expansion supply capability limited | Voltage droop at far points, false inputs |
| Connectors | Expansion plugs seated, latches locked | Intermittent contact, whole I/O groups vanish |
Automatic addressing is a double-edged sword: no manual addresses to set, but inserting a module in the middle shifts all following addresses and every reference in the program moves. Set the rule: modules are installed in drawing order, additions only at the end; a mid-train insertion forces a full review of address references.
When analog/temperature modules mix with digital ones: ① special modules occupy designated address blocks by position (see the catalogue mapping) — confirm actual addresses in the configuration or monitor before referencing them; ② analog modules draw significant 24 V current — sum the budget when several hang together; ③ some modules have placement requirements (e.g. after digital modules) — follow the manual's installation notes.
For distant cabinets (multi-station machines, lines with two ends) use CANLink remote modules: the master at the PLC, slave modules out at the stations, bus-wired with twisted shielded pair. Rules: ① terminating resistors at both bus ends (many slaves have built-in DIP switches); ② cable length and station caps per catalogue; ③ every slave gets a unique station number — duplicates are the number-one cause of "the whole bus won't come up"; ④ keep the bus cable away from power lines, shield earthed at one end.
| Item | Local stacking | CANLink remote |
|---|---|---|
| Distance | Within the rack (centimetres) | Up to hundreds of metres (per catalogue) |
| Addressing | Automatic, sequential | Manual station numbers |
| Point cap | Bound by base-unit limits | Per-slave points, bus capacity limit |
| Typical use | Extra I/O in one cabinet | Distributed acquisition and control across cabinets |
Expansion input commons and sensor supplies draw from the same 24 V, and each module adds backplane current. Sum three accounts: ① total 24 V current = all sensors + input optocouplers + module 24 V consumption; ② the base unit's backplane supply capability for expansions (per-point or per-module, from the catalogue); ③ the external 24 V supply sharing ground with the PLC. The classic symptom of overload is "with everything on, the last modules' inputs wander" — textbook voltage droop.
| Check | Method | Pass criterion |
|---|---|---|
| Module order | Compare stacking order against the drawing | Identical |
| Connector seating | Visual + nudge the latches | No skew, latches locked |
| Address verification | Monitor actual module addresses powered up | Match program references |
| Station numbers | Confirm each remote module's DIP | No duplicates, match configuration |
| Terminators | Measure at both bus ends | Fitted at catalogue value |
| Supply measurement | Meter the 24 V at the farthest point | ≥ 90% of nominal |
| Full-load test | All inputs active simultaneously | No input jitter or loss |
Expansion connection is a triple budget: address space + power capability + physical link. Points and addresses decide whether it can connect, power decides whether it is stable, and connectors and cabling decide whether it stays reliable. Do the three sums on paper and the field becomes a plug-and-lights-on exercise.
Expansion capability, address mapping and power ratings follow the Xinje XL Series User's Manual and the CANLink Remote Expansion Module Manual; cable routing and shield earthing follow GB 5226.1 / IEC 60204-1 and bus installation practice; exact counts and length caps follow the model catalogue.
Write the handover rule on the drawing: expansions only appended at the end; a mid-train insertion forces a full program review. Print the CANLink station table for the panel door so nobody re-DIPs by guesswork.