The WIKA TR10 is a Pt100 thin-film platinum assembly, and its calibration decides whether the readings deserve trust. Preparation, a three-step verification flow and tolerance criteria below, with record-keeping essentials.
Before calibrating, three checks: nameplate - Pt100, tolerance class A or B, range against process requirements; appearance - protection tube without dents or cracks, terminals clean and tight, no kinks in the mineral-insulated section; loop - insulation from element to tube above 20 megohms at 500V megger, three-wire balance within limits. Prepare standards: a secondary standard platinum thermometer or precision digital reference (error under one third of the tolerance under test), a stirred bath or dry-block calibrator, an ice-water vessel, and a four-wire measuring instrument, all within their calibration validity - the legal basis of the data.
Step one, ice point: immerse the element and the reference together in a proper ice-water slurry, sensing tips fully covered, read after 10 minutes of stabilisation; a class A unit must read 0±0.15 degrees. Step two, bath comparison: set the bath to 100 degrees or two to three common process points, compare immersed readings, and note deviations; for dry blocks match the insert hole to the element diameter with clearance under 0.5mm, and immersion depth deep enough to defeat stem losses. Step three, data: deviations at each point must sit inside the tolerance band and change smoothly with temperature - a sudden step points at contact or element damage. Disposition: class A units over tolerance but under 0.5 degrees of bias may be downgraded to class B with a note; larger or fast-drifting units are replaced. Records carry five fields: tag number, date, standard reference, values and deviations per point, verdict and next due date. Trend across calibrations: monotonic drift means element aging, erratic jumps mean wiring or insulation. Period: two years generally, annually in hot, wet or vibrating duty, and per the safety-instrument schedule for interlocked points. TR10 thin-film elements drift little in normal service - when a check shows clear drift, suspect mounting and wiring before replacing.
| Step | Operation | Pass criterion |
|---|---|---|
| Nameplate and visual | Type, class, range, tube condition | Matches process, no damage |
| Insulation test | 500V megger to the tube | Above 20 megohms |
| Ice point | Ice slurry, 10 minutes, both immersed | Class A: 0±0.15 degrees |
| Bath comparison | Two or three process points | Deviations inside the band, smooth |
| Data review | Monotonicity of deviation | No sudden steps |
| Disposition | Downgrade under 0.5 degrees, else replace | Verdict and next date recorded |
The value of calibration lives in the trend, not the single pass: one good point proves today only, and the cross-period trend exposes aging. Archive every TR10 curve, schedule replacement on trend alarms, and planned swaps beat emergency trips every time.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Industrial platinum RTD tolerances per GB/T 30121 (IEC 60751); verification per the relevant metrology regulations. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.