A pressure verification done out of order produces a beautiful report nobody can trust. The routine is simple when followed strictly: wiring, leak check, five point up and down runs, error judgment, adjustment, restore, then a trend watch before sign-off.
Confirm the reference first: the calibrator must be at least three times more accurate than the device under test, so a 0.5 class transmitter needs a 0.05 class or better reference, with a valid certificate. Wire the transmitter to the pressure port, put the 24 V supply and the 250 ohm sense resistor or the built-in measurement terminals in the loop, and read 4 to 20 mA directly. Warm up for 5 to 10 minutes, then leak check: pressurise to span, hold 1 to 3 minutes, and investigate any decay above 0.5 percent before continuing, because a leak masquerades as hysteresis and ruins the run.
Run five points at 0, 25, 50, 75 and 100 percent of span, ascending with a stable hold at each point, then repeat descending to expose hysteresis. Error in percent equals measured mA minus theoretical mA, divided by 16 mA, times 100. For a 0.5 class transmitter every point must stay within plus or minus 0.5 percent, and the zero should return to 4 plus or minus 0.16 mA after venting. Adjust zero first, then span, since span adjustment drags the zero; alternate two or three rounds until it converges, and record before and after values.
The five classic field mistakes: pressurising with the equalising valve wrongly set, opening a hot steam line before it has cooled, slamming the hand pump and bending a bourdon pointer, skipping the ambient temperature record so thermal effects cannot be accounted, and reassembling the manifold in the wrong state so the transmitter reads nothing after startup. After restore, watch the trend for 10 minutes against the DCS and only chase discrepancies above 0.5 percent.
| Symptom | Cause | Action |
|---|---|---|
| Decay above 0.5% on hold | Fitting or valve leakage | Reseal, retape, retest |
| Large up and down difference | Hysteresis or friction | Send for repair, log the value |
| Small zero offset | Normal drift | Rezero and repeat five points |
| Zero shifts after span set | Zero and span interact | Alternate 2~3 rounds |
| Noisy output | Damping too small or leak | Set 1~2 s damping and observe |
| DCS differs by 0.5%+ | Range configuration mismatch | Check DCS config against nameplate |
This routine suits field periodic verification of industrial transmitters up to 0.2 class; tighter instruments go to the laboratory. Leak check before measuring, run all five points in both directions, log the errors, and track the trend after restore. The usual interval is 12 months, shortened to 6 for safety interlock transmitters.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Verification per JJG 882; performance requirements per GB/T 17614.1; electrical safety per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.