In chemical tank farms an ultrasonic level transmitter must clear two hurdles before it measures anything: the Ex certification must match the gas zone, and the wetted materials must survive the vapour above the liquid. Pick either one wrong and you end up with drifting readings or a rejected installation.
Match the Ex marking to the plant zone classification. Zone 0 demands intrinsic safety Ex ia IIC T4 with an associated isolator; Zone 1 accepts Ex ib or flameproof Ex d housings; Zone 2 tolerates Ex n. Always check the temperature class too: if the site gas belongs to group T3, a T4 rated transmitter keeps a safe margin. Verify every digit of the certificate against the nameplate, because a single missing code fails the acceptance inspection under GB/T 3836.1.
Corrosion rarely attacks the probe body first, it is the vapour above the liquid. HCl mist above hydrochloric acid tanks pits 316L within months, so specify a PTFE or PVDF radiating face; dilute alkali and marine salt atmospheres are fine with 316L plus periodic cleaning. Foaming media absorb most of the acoustic energy, and once echo amplitude drops below roughly 30 percent the instrument loses the surface entirely, so switch to guided-wave or free-space radar in those services.
Respect the blind zone: most sensors have 25 to 50 cm of dead band directly beneath the transducer, so keep the maximum level at least the blind zone plus 10 cm away from the face. Never mount the unit above the fill point, where splash and foam swallow echoes, and shade outdoor units because direct sun at 60 degrees C can add 1 to 2 percent of thermal drift that looks exactly like instrument failure.
| Site condition | Recommended setup | Do not |
|---|---|---|
| Zone 0 gas atmosphere | Ex ia IIC T4 probe with isolator | Flameproof housings in Zone 0 |
| Zone 1 gas atmosphere | Ex ib or Ex d probe | Temperature class below the gas group |
| HCl or strong acid mist | PTFE/PVDF face, flange mount | Bare 316L diaphragm, pits in months |
| Dilute alkali or salt fog | 316L face with periodic cleaning | Scale build-up absorbs the echo |
| Outdoor tank roof | Sunshade and conduit wiring | Direct sun adds 1~2% drift |
| Foaming or heavy vapour | Use radar or guided-wave radar | Ultrasound fails in foam |
Use this table at the tender stage for tank farms and effluent plants. Fix the zone and temperature class first, then the wetted materials, then check the blind zone against the nozzle geometry. During acceptance, compare every Ex code on the nameplate with the certificate and reject any mismatch.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Ex equipment selection per GB/T 3836.1 and IEC 60079-0; overall machine safety per GB/T 5226.1 / IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.