Three-wire RTD wiring exists to cancel lead resistance, yet sloppy practice lets the error back in. Quantified impacts of imbalance, contact resistance and gauge-length effects, with wiring and acceptance criteria.
A Pt100 element reads 100 ohms at 0 degrees with 0.385 ohms per degree. The three-wire scheme places three leads into two bridge arms so two lead resistances cancel. Three error sources remain: lead imbalance - unequal core resistances leave residual error, 1 ohm of imbalance meaning about 2.6 degrees (1 divided by 0.385), and a wire landed on the wrong terminal dwarfs that; contact resistance - loose or oxidised terminals add tenths of ohms, worth tenths to several degrees of drift, the most common field fault; gauge and length - 100 metres of 0.5 square-millimetre copper runs about 3.7 ohms per core, cancellation helps but imbalance and heating still leak through.
Quantified wiring requirements: same batch, same length, same gauge for all three cores, imbalance within 0.1 ohm, corresponding to 0.26 degrees; crimped terminals torqued with a screwdriver, never bare twists; long runs at 1 square millimetre or more - 100 metres of it is about 1.7 ohms per core, acceptable once cancelled and calibrated at commissioning. Two-wire wiring must be judged mentally: 2 ohms of lead adds about 5.2 degrees, so two-wire is only for runs under 1 metre or low-accuracy duty. Field checks: open the three cores at the terminal block and measure each - spread beyond 0.1 ohm means re-crimp or replace; contact resistance shows on a low-ohms meter. Acceptance by the ice-point method: element and reference thermometer together in 0-degree ice water, class A Pt100 tolerance ±(0.15+0.002|t|) degrees, so ±0.15 at zero. Repeat every two years, annually in harsh plants.
| Source | Magnitude | Countermeasure |
|---|---|---|
| Lead imbalance, 1 ohm | About 2.6 degrees | Same batch, length, gauge; within 0.1 ohm |
| Terminal contact resistance | Tenths to several degrees of drift | Crimped terminals, torqued |
| Long thin leads | Amplified residual imbalance | 1 square millimetre plus, calibrate |
| Two-wire misuse | About 5.2 degrees per 2 ohms | Only under 1 metre runs |
| Landed on wrong terminal | Errors of ten degrees and up | Check per the terminal drawing |
| Element aging | Class A ±0.15 degrees at 0 | Periodic ice-point checks |
Three-wire accuracy is built at the terminals: same batch and length, crimped and torqued, calibrated at commissioning, ice-point checks on schedule - after those four steps lead error stops being the dominant term. Archive the terminal drawing and check records for direct comparison during faults.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Industrial platinum RTDs and tolerances per GB/T 30121 (IEC 60751); wiring practice per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.