An earth-fault alarm on a motor calls for a method: confirm with a megger, split the circuit to find the point, then decide between drying a wet winding and rewinding a punctured one.
Earth fault means insulation between winding and frame has failed. Working criteria at 500V megger: above 1 megohm hot and 0.5 megohm cold as the floor. A reading near zero is a metallic fault; tens or hundreds of kilo-ohms usually means moisture. Disconnect the drive or soft starter before testing and discharge the winding to frame afterwards - the megger stores charge and its 500V output kills electronics.
Localise by splitting: open the terminal box and separate the cable from the windings. Low resistance on the cable means a damaged run and a remade joint; low on the motor means test each phase at the terminal board to isolate the faulty one. Wet insulation in the tens of kilo-ohms that climbs as it dries is baked at 80~100C for 4~8 hours and retested every two hours until stable above 2 megohms. A punctured winding that stays near zero cannot be fixed on site - rewind or replace. Then close the loop on the cause: rubbing leads, worn slot wedges, a stator-rotor rub, or voltage spikes reflected from long unshielded cable on a drive.
| Megger reading at 500V | Verdict | Route | Note |
|---|---|---|---|
| Above 2 megohms, stable | Healthy | Run normally | Log the value |
| 0.5~2 megohms | Damp or ageing | Dry out, retest | Check humidity and water |
| Tens of kilo-ohms, climbs when dried | Mostly moisture | Bake 80~100C for 4~8h | Retest every 2 hours |
| Near zero, metallic | Puncture | Rewind or replace | Find rub or worn wedges first |
| Cable side low | Damaged cable | Locate and remake joint | Review cable protection |
The sequence: separate, split, dry first, condemn last. A recovered motor goes back only after the root cause is fixed and the new insulation value is on file.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Insulation requirements per GB/T 755 and handover test standard GB 50150, earthing and protection per GB/T 5226.1 clause 8. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.