Fault Diagnosis & Standards (100 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Common inspection items for electrical hazard surveys

An electrical hazard survey is more than a walk-around: loose terminals, dead e-stops and overloaded ducts are all hiding hazards. This page gives an area-by-area checklist with acceptance criteria so nothing gets skipped.

1. How it works

Twelve checks inside cabinets: terminal tightness with infrared spot checks (anything over 20 K rise gets opened up), conductor insulation (tacky, chafed or cracked sleeving), wiring practice (one to two conductors per terminal, crimps seated, shields bonded per rule), clearance around heat sources (resistor banks with nothing stacked above), labelling (circuit numbers, terminal marks, warning tags), protection (live parts at IP2X or better, barriers intact), earthing (PE bar terminations and door straps), foreign objects (no drawings, rags or tools left inside), filters (clean and intact), condensation (heaters working, no water traces), spare fuses (sizes marked) and drawings (matching the machine).

2. Numbers and practice

Ten checks in the field: mobile cables in drag chains and reels for wear, exposed cores and illegal mid-span joints; temporary wiring — the worst offender — removed when its approval expires; industrial socket-outlets with correct IP and mechanical interlock, never domestic types on power; limit switches and e-stops function-tested twice yearly with unobstructed reach along the whole line; PE bonds on motors and frames, re-terminated when rusted or loose; guards and interlock switches functional; maintenance sockets with RCD trip tests; the environment (standing water, dust, corrosive media attacking equipment); 0.8 m of clear working space in front of distribution boards; and fire response (dry-powder or CO2 extinguishers in place, never water-based beside electrical gear).

3. Pitfalls and fixes

Test-based surveys on fixed intervals: earth resistance yearly at 4 ohms or less; RCDs tested monthly by button and quarterly by measured current and time against 30 mA and 0.1 s; insulation sampling yearly on key circuits; infrared surveys twice yearly on busbars, terminals and breaker contacts with anything over 20 K tagged for action; and protection relay settings verified annually. Grade every finding: class A hazards (immediate shock or fire risk, such as broken PE or exposed live parts) stop the machine now; class B (serious but not immediate) get 24-72 hours; class C (documentation and housekeeping) get a week. Checklists close only with photos, owners, deadlines and sign-off — the record is also your evidence chain.

4. Electrical hazard survey quick reference

AreaFocusCriterionInterval
Cabinet terminalsTightness and temperatureRise ≤20 KInfrared twice yearly
Cabinet earthingPE bonds and door strapsVoltage-drop method in specTwice yearly
Mobile cablesWear and exposed coresNo bare copper, no jointsMonthly visual
Temporary wiringApproval and expiryNo overdue, no rogue runsMonthly
Emergency stopsFunction testReachable, immediate stopTwice yearly
RCD protectionTrip test30 mA and 0.1 sButton monthly, measured quarterly
Board accessWorking space0.8 m clear in frontMonthly
Infrared sweepJoint temperature riseTag anything over 20 KTwice yearly

5. Notes

For monthly and quarterly plant electrical safety rounds and special campaigns. The checklist earns its keep only through execution and closure: tick with traces, photograph with numbers, rectify by deadline, recheck with signatures. Give inspectors the authority to stop on class A findings — the approval window is where accidents happen.

6. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Machine electrical safety per GB/T 5226.1 (IEC 60204-1); LV distribution design per GB 50054; electrical safety practice per GB/T 13869. Always check the device datasheet and the product design file for ratings and derating.

7. Cautions

⚠️ Three common pitfalls:
① Recording hazards without closing them out: the checklist goes into a drawer and the hazard runs until something burns; rectify, recheck and sign, every time
② Testing RCDs only with the button: the button proves the mechanism moves, not that it trips at 30 mA in 0.1 s; measure quarterly
③ Letting material pile up in front of boards: 0.8 m of working space vanished means no emergency switching and no access; add it to the monthly round

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.