MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › Shared versus separate earthing: which to use where
HomeModels
Table of contents

On this page

Fault Diagnosis & Standards (100 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Shared versus separate earthing: which to use where

Whether lightning, protective and functional earths should share one grid or stay separate has been argued for decades — and the answer is clear. This page covers the mechanism of both schemes, the modern standard recommendation and field practice.

1. How it works

Separate grids (independent earth electrodes 20 m or more apart) were meant to keep lightning current out of equipment via the shared network. In practice, however, potential differences and capacitive coupling between two grids during a strike can reach tens of kilovolts and punch through equipment insulation — modern practice has shown separate earthing to be more dangerous in storms. Shared (combined) earthing joins lightning protection, PE and signal references at one point so the whole system rises together with no difference to break down. GB 50057 and IEC 62305 both mandate the shared approach, with the combined resistance set by the strictest requirement (lightning 10 ohms, protection 4 ohms, communications 1 ohm — so 1 ohm for the grid).

2. Numbers and practice

Implementation rests on three principles. Single-point collection: all earth trunks (down-conductors, PE, shield trunks, DC functional earth) meet at the main equipotential terminal board (MEB); local boards (LEB) in rooms connect to the MEB by dedicated trunks. Spacing: down-conductors keep 1 m from signal cables or use metal conduit; the grid meshes at 3-5 m, buried 0.6-0.8 m, with electrodes 1.5 m clear of foundations. Resistance: 1 ohm or less for the combined grid when communications are involved, measured by the three-pole fall-of-potential method, with treatment soils or parallel electrodes where soil resistivity is high. Downstream of the MEB each branch runs its own route — a tree with one root and independent branches.

3. Pitfalls and fixes

When separation is still legitimate: systems of different ownership or separate buildings (each grid complete on its own); intrinsic-safety systems with vendor and certification requirements on the earth reference; and laboratory floating measurements, which are better served by isolation transformers and floating references than by simply splitting earths. Legacy twin grids are not maintained but combined: bond them together at the MEB with a 35 mm² or larger copper tie — and where the measured inter-grid difference exceeds 1 V, this conversion is mandatory, retested before each storm season.

4. Shared versus separate earthing quick reference

SituationRecommendationResistanceKey measure
All systems in one buildingShared earthing≤1 ohm with commsSingle point at MEB
Plant plus separate substationShared earthing≤1 ohmConnect the trunks
Lightning and protective earthShared, mandatedStrictest valuePer GB 50057
Legacy twin gridsCombine them≤1 ohmEquipotential tie at MEB
Separate ownership buildingsSeparate acceptableEach to its own spec20 m minimum spacing
IS system special needsPer certificationPer vendorFollow the certificate
Floating lab measurementsIsolation plus floatingPer measurement needIsolation transformer
Before storm seasonRe-testRecorded valuesOnce a year

5. Notes

For plant earthing design, retrofits and annual checks. The verdict is firm: within one building, share the grid and collect it at one point; separation survives only across independent ownership. A legacy twin grid is cured by an equipotential tie, which removes the lightning back-flash risk at its root.

6. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Lightning protection per GB 50057 and IEC 62305; information rooms per GB/T 50462; machine equipment earthing per GB/T 5226.1 (IEC 60204-1). Always check the device datasheet and the product design file for ratings and derating.

7. Cautions

⚠️ Three common pitfalls:
① Insisting on separate lightning and protective electrodes: tens of kilovolts between the grids during a strike punch through insulation and cause back-flash damage; share them per GB 50057
② Interconnecting earth trunks at random points: loops inside the grid induct lightning current; collect everything at the MEB, once
③ Tolerating a 3 V difference between legacy grids: communication errors and equipment damage never stop; an equipotential tie is the real fix

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.

Related reading

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Electrical Knowledge Base · free self-study reference for electrical & automation engineers, 3D CAD models at MOULDL