Busbars too close, foreign objects bridging, aged insulation — a phase-to-phase short is one bang and enormous loss. This page covers why clearances fail, the post-short-circuit workflow, and what must be checked before re-energising.
Four causes. Design and installation: busbar spacing under the 20 mm customary minimum for 380 V systems (never below the GB/T 16935.1 table values), undersized support insulators, squashed cable bundles. Intrusion: conductive dust build-up (metalworking and graphite are the worst), rodents and snakes in cabinets, tools left behind after maintenance. Ageing: cracked heat-shrink, carbonised tracking paths on insulator surfaces after flashover, damp supports. Overvoltage: lightning or switching surges breaking down marginal distances. Early warnings include audible discharge hissing, visible carbon tracks, thermal-camera hot spots (over 10 K spread) and corona under UV inspection.
After the trip: de-energise, verify dead, tag, and let capacitors discharge for three minutes or more. Then a sequence: inspect and photograph the fault point (metal spatter marks it) and its blast range (deformed bars, shattered insulators, arc-affected neighbours); gather evidence — samples of foreign material, carbonised debris, and the protection records showing fault current magnitude and duration, which distinguish bolted from arcing faults; repair with same-specification busbars and insulators at proper torque; clean the entire cabinet with a vacuum (never compressed air); and re-measure every phase-to-phase and phase-to-earth distance plus insulation resistance.
Before re-energising, six checks: fault repaired and documented; all insulation resistance readings above 5 megohms at 500 V; distances verified with calipers, never by eye; cabinet clean of dust and foreign matter; protection settings re-verified (CTs and relays can suffer in the fault); and secondary circuits and metering normal. Prevention: insulating sleeves or phase barriers on busbars to add redundancy over distance, pressurised or sealed dust protection in dusty plants, annual thermographic surveys of joints and insulators, rodent-proof sealing of cable entries, and tool-and-material accountability after every job. Anything at marginal distance gets enlarged a full step — no critical values left in service.
| Stage | Action | Key point | Pass criterion |
|---|---|---|---|
| Emergency isolation | De-energise, verify, tag, discharge | Capacitors: 3+ minutes | No residual voltage |
| Visual inspection | Locate fault and blast range | Photograph evidence | Extent documented |
| Evidence | Collect debris, pull relay records | Distinguish arc vs bolted | Cause identified |
| Repair | Replace bars and insulators | Same spec, proper torque | Per manufacturer |
| Full cleaning | Vacuum dust and swarf | Never compressed air | Visibly clean |
| Insulation test | Phase and earth | 500 V megger | ≥5 MΩ |
| Distance re-check | Caliper measurement | Every phase, every point | Meets table values |
| Re-energise | Hipot plus protection review | Racked in stages | Records archived |
For LV distribution and control busbars alike. The rule: distance measurement plus insulation testing, both passing, before any re-energisation. Never swap the burned parts and switch back on — repairing without finding the cause simply schedules the next explosion.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Insulation coordination per GB/T 16935.1 (IEC 60664-1); LV switchgear assemblies per the GB/T 7251 series; machine safety per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.