Visual checks are the cheapest part of inspection and the easiest to fake: what to look at, and what counts as abnormal, needs explicit criteria. This page splits visual inspection into ten signal types, each with abnormal features and handling.
Ten signal types. Discolouration: yellowed or blackened insulation, heat-stained terminals, blistered cable sheaths — all overheating marks. Burning: pitted contacts, arc traces on busbars, carbonised tracking on insulators. Dust: filters too caked to see light through, surface film inside cabinets, conductive dust bridging terminals in dusty shops. Water and rust: wet cabinet floors, rust weeps, seeping glands. Deformation: buckled enclosures, sagging trays, cracked insulators. Looseness: conductors backing out, crimps sliding free, broken ties dropping harnesses. Leakage: oil film near hydraulics, bulging electrolytic capacitors weeping electrolyte. Indicator faults: lit fault LEDs, phase lamps wrong, level gauges low. Missing parts: absent covers, screws, labels and plugs. Environment: storage against cabinets, blocked aisles, obstructed vents.
Quantifying the judgement: slight yellowing of insulation allows continued running with a tracking note, blackening or blistering means act now; filters washed when light no longer passes, dust between terminals cleaned with power off; a damp floor with no standing water gets ventilation the same day, standing water or drips mean de-energise first; surface rust gets wire-brushed and painted, structural perforation or a rusted-through door strap means replacement; insulator cracks or tracking marks mean immediate removal; bulging DC-link capacitors have lost 20 percent or more of capacity and get replaced. Photograph every finding. The same signal recurring at the same spot is a system problem — insufficient cooling, overload or wrong environmental rating.
Organisation and tools: a torch for cabinet corners, a mirror for busbar backs, a magnifier for cracks and tracking, a camera with numbered photos, a spot pyrometer for instant confirmation. Fix the route per machine (surface, interior, base, wiring zone, surroundings) so nothing is skipped. Frequency by environment: weekly in normal shops, daily in dusty or wet areas, monthly outdoors plus after every rain. Design the record sheet around the ten signals with tick boxes and anomaly numbers. Train newcomers on ten joint rounds with a photo library of typical discolouration, dust and cracks. Visual screening and instrument confirmation are a pair — each is worthless without the other.
| Signal | Abnormal feature | Severity | Action |
|---|---|---|---|
| Discolouration | Blackened insulation, stained terminals | Yellow tracks, black acts now | Confirm with pyrometer |
| Burning | Pitted contacts, tracking marks | Remove from service | Replace contacts and insulators |
| Dust | Opaque filters, dusty terminals | Wash when cooling suffers | Clean with power off |
| Water and rust | Wet floor, rust weeps | De-energise on standing water | Seal and dry |
| Cracks | Insulator cracks, tracking | Immediate replacement | Swap the part |
| Bulging capacitors | Domed tops, leaked electrolyte | Over 20 percent loss | Schedule replacement |
| Missing parts | Covers, screws, plugs gone | Restore IP integrity | Refit and log |
| Environment | Storage and blocked vents | Clear immediately | On-site rectification |
For the visual component of any inspection system. The ten signals are the shared language: train against a photo library, record by signal type, photograph with numbers. Visual findings screen, never conclude — confirm with the pyrometer or instruments before acting.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Maintenance per GB/T 5226.1 (IEC 60204-1); enclosure integrity per GB/T 4208; electrical safety per GB/T 13869. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.