Testing mistakes produce either false data or destroyed equipment: testing live, leaving electronics connected and skipping discharge are the three repeat offenders. This page lists the ten most common mistakes and the correct practice for each.
Before the test. Testing live is meaningless, dangerous and ruins the meter — de-energise, verify, discharge (a minute or more for capacitive equipment). Leaving drives, soft starters, PLC modules and surge protectors in circuit destroys the electronics, while an SPDs varistor drags readings down — disconnect their power and signal wiring first, photograph the disassembly and restore from the record. Testing the whole assembly with links in place measures motor plus cable plus contactor plus secondaries as one number, hiding the faulty segment — split at terminal boxes and junctions and measure piece by piece.
During the test. Wrong voltage range punctuates relay coils and electronics on control circuits (use 250 V below 50 V, 500 V for 50-500 V, 1000 V above). Reading without timing is incomparable: insulation rises as capacitive charging and absorption currents decay, so standardise on the 60-second reading, with the absorption ratio as R60/R15. In humid high-voltage work, surface leakage along the probes is significant — use the guard terminal to bypass it. And always record temperature and humidity: resistance halves roughly every 10 C, so unrecorded conditions make trends meaningless.
After the test. Discharging is non-negotiable: cables and windings store 500-1000 V of charge, and touching or reconnecting without discharge is a real shock and burnout hazard — discharge to earth and confirm with a multimeter. Restoration errors — the SPD left out, a link not refitted, an earth strap left loose — are managed with a disassembly checklist ticked item by item and verified against the drawing. Finally, never conclude from one reading: moisture, dirt and temperature swing insulation widely, so dry and retest before verdicts. Control measures: test-area tagging, communication between both ends, and yearly meter calibration.
| Mistake | Consequence | Correct practice | Key value |
|---|---|---|---|
| Testing live | Shock, ruined meter, void data | De-energise, verify, discharge | 1 min or more discharge |
| Electronics still connected | Punctured drives and modules | Disconnect and photograph | Restore and verify |
| Whole-assembly test | Low reading, no localisation | Split and measure piecewise | Start at terminal boxes |
| Wrong voltage range | Punctured coils, false readings | Select by rated voltage | 250/500/1000 V |
| Reading without timing | Incomparable data | Standard 60 s steady value | Absorption R60/R15 |
| Guard terminal unused | Surface leakage lowers readings | Use G terminal when humid | High-voltage precision work |
| No temperature record | No valid trends | Record and convert | Halves per 10 C |
| No discharge after test | Shock and burnout | Discharge to zero, confirm | Multimeter check |
For maintenance electricians and test crews. Memorise the ten, and before every test run the mantra: de-energise, verify, discharge; disconnect electronics and SPDs with photos; select the range; time the reading; log the environment; discharge afterwards; restore from the checklist. Calibrate the meter yearly and tag the test area.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Test methods per GB/T 50150 and GB/T 5226.1 (IEC 60204-1); meter calibration per the relevant verification rules; motor insulation per IEC 60034-27. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.