A zero insulation reading does not always mean breakdown: it can be an undischarge, a metallic path through closed contacts, or the wrong instrument. This page sorts the causes, gives the retest procedure and the repair decisions.
Six causes of a zero reading: true breakdown with a metallic earth fault; an inherent conductive path in the object under test (closed breakers bridging phases, contactor contacts in circuit); residual charge distorting readings (usually erratic or negative rather than zero); wrong instrument or range (meggering a circuit that is meant to conduct); test lead faults (shorted probes, damaged shield touching earth); and measuring live equipment, which is meaningless and dangerous. The first step is always electrical topology: list the switches, contacts and components between the points under test, separate what should conduct from what should insulate, then judge.
The retest sequence: confirm the object is dead and discharged (a minute or more for capacitive items); isolate it — open terminal-box links, disconnect cables and neighbours; self-check the megger (probes shorted reads zero, open reads infinity) and swap leads or meters; then bisect — measure the whole cable, and on a zero reading split it and test halves until the faulty segment is found; compare voltage ranges (a genuine breakdown reads zero on every range, while surface contamination and moisture read worse at higher voltage); and finally cross-check with a multimeter: a few ohms to hundreds of ohms is a metallic earth fault, while tens or hundreds of kilohms is degraded insulation, not a dead short.
Decisions after diagnosis: a metallic fault (ohms) means punctured windings or damaged cable — locate the fault point (bridge method or pulse reflection on cables) and rewind or replace; a low-but-not-zero reading (kilohms to hundreds of kilohms) suggests moisture or surface tracking — dry at 60-80 C for 8 hours and retest; recovery above 5 megohms returns the equipment to service with tracking, otherwise treat as breakdown. Classic traps: a motor reading zero because the star links were still fitted (a legitimate path), and cable phase-to-phase readings that actually measured through connected equipment at both ends — open one end first.
| Scenario | Likely cause | How to tell | Action |
|---|---|---|---|
| Motor to earth reads zero | Links fitted or breakdown | Remove links, retest | Still zero: send for repair |
| Cable phases read zero | Equipment connected both ends | Open one end | Bisect to localise |
| Multimeter shows tens of ohms | Metallic earth fault | Resistance cross-check | Locate and repair |
| Hundreds of kilohms | Moisture or semi-breakdown | Dry and retest | Recoverable with tracking |
| Zero on every voltage range | True breakdown | Range comparison | Treat as breakdown |
| Worse at higher voltage | Surface contamination | Clean and retest | Clean and dry |
| Leads shorted still not zero | Instrument or lead fault | Swap meter and leads | Repair the tester |
| Erratic or negative readings | Residual charge | Discharge and retest | Make discharge a habit |
For insulation testing on motors, cables, transformers and distribution circuits. The discipline: before declaring breakdown, check the topology — links, closed contacts and connected cable ends cause half of all false zeros; use megger plus multimeter plus bisection.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Test methods per GB/T 50150 hand-over standard and IEC 60034-27; instrument safety per GB/T 5226.1 maintenance clauses and related DL/T test procedures. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.