MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › Servo system fault prevention: checks, margins and pitfalls
HomeModels
Table of contents

On this page

Fault Diagnosis & Standards (100 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Servo system fault prevention: checks, margins and pitfalls

Most servo failures do not happen out of nowhere; they build up through clogged cooling, loose earthing and casually edited parameters. This page organises prevention into three lines — electrical side, load and tuning side, and site management — with concrete check intervals and acceptance numbers so faults are caught before downtime.

1. How it works

On the electrical side, earthing and cooling decide most outcomes. Bond the PE conductor to the dedicated earth terminal with a resistance of 4 ohm or less, never through painted cabinet surfaces. Leave at least 50 mm of airflow around each drive, clean filters monthly, and investigate whenever heatsink temperature rise exceeds 40 K. Route encoder cables as shielded twisted pairs at least 200 mm from power cables, with the shield bonded 360 degrees at both ends.

2. Numbers and practice

On the load side, size the motor so peak load torque is within 1.5 to 2 times the rated torque, keep the RMS torque below 80 percent of rating, and hold inertia ratios inside 10 for high-response axes and 20 otherwise; add roughly 50 ms of acceleration time per extra 5:1 of inertia ratio. Raise loop gains only until vibration or audible whine appears, then back off 10 to 20 percent. Export and version-stamp parameters before every change and verify full-stroke positioning afterwards.

3. Pitfalls and fixes

Turn prevention into a tiered routine: two minutes of status and noise checks at every shift start, fifteen minutes weekly for temperature, fans and terminal tightness, and a half-day quarterly session for shield continuity, terminal re-torquing and cabinet cleaning. Megger tests on servo motors always require disconnecting the encoder plug and power leads first, and emergency stop must go through the safety circuit, never through a branch breaker.

4. Servo prevention checklist quick reference

ItemIntervalAcceptanceCorrective action
Drive cooling pathMonthlyTemp rise ≤40 K, filter cleanWash filter and fan blades
PE earth resistanceHalf-yearly≤4 ohm, terminals tightRe-crimp and add anti-corrosion
Encoder cable shieldQuarterlyShield continuous, earthed both endsRedo 360-degree gland bond
Motor housing tempWeekly≤80 C (class B insulation)Check load and cooling, derate
DC bus no-load voltageHalf-yearlyAbout 540 V on 380 V drivesInspect rectifier and capacitors
Parameter backupAfter every changeMatches archived fileRe-export and version-stamp
Coupling and keywaysQuarterlyNo looseness, noise or wearRe-align, replace inserts
Regen resistor tempQuarterly≤120 C, no burning smellFit larger resistor or slower decel

5. Notes

Apply this to machining centres, robots and special machines fitted with AC servos. Build it into the equipment OPL sheets: two minutes pre-shift, fifteen minutes weekly, thirty minutes quarterly. Any item out of limits opens a repair order immediately.

6. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Machine safety requirements per GB/T 5226.1 (IEC 60204-1); servo motor sizing follows IEC 60034 and related national standards. Always check the device datasheet and the product design file for ratings and derating.

7. Cautions

⚠️ Three common pitfalls:
① Meggering a servo motor with the encoder still connected: 500 V test voltage couples through the windings and punches the drive output stage; always unplug first
② Using the main breaker as an emergency stop: each interruption hammers the DC bus capacitors and shortens their life; route e-stop through the safety circuit instead
③ Skipping full-stroke verification after raising gains: overshoot and resonance only show under load and travel, and the axis crashes the next shift

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.

Related reading