Knowledge Base › Electrical Knowledge Base › Adjusting acceleration and deceleration ramps on the Siemens G120
HomeModels
Table of contents

On this page

Drives & Actuators (102 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Adjusting acceleration and deceleration ramps on the Siemens G120

Wrong ramp times on a G120 mean either overcurrent on start or overvoltage on stop. This page gives the P1120 and P1121 adjustment procedure, the sizing arithmetic and the verification steps before signing off.

1. How it works

P1120 sets the ramp-up time from zero to maximum frequency and P1121 the ramp-down, both defaulting to 10 seconds. Too short an up-ramp pushes starting current into the limit around 1.5 times rated and trips; too short a down-ramp lets the load regenerate into the DC bus until voltage approaches 800V on a 540V system. Start from 3~10 seconds for low-inertia loads and 30~120 seconds for fans, centrifuges and flywheels, then adjust in 20~50 percent steps.

2. Practice and pitfalls

Verify with three readings: starting current peak within 1.5 times rated, bus voltage peak at least 50V below the trip threshold during deceleration, and total ramp time within the process cycle budget. A rough rule puts deceleration time at 3 to 5 times the mechanical time constant of the load. After acceptance, save parameters to EEPROM or export a file, because a power failure with no backup erases the whole tuning session.

3. Ramp time fault symptom quick reference

SymptomCauseAdjustmentNote
Overcurrent on startUp-ramp too shortRaise P1120 by 50 percentOr raise current limit
Overvoltage on stopDown-ramp too shortRaise P1121 by 50 percentOr add braking resistor
Cycle too slowUp-ramp too longCut P1120 by 20 percent stepsKeep current off the limit
Motor heats when stoppingRegeneration into the busLonger P1121 or brake unitWatch bus voltage
Jog lurch at startJog uses its own rampCheck P1130 jog rampsJog ramps are separate

4. Notes

Field rule: overcurrent means lengthen the up-ramp, overvoltage means lengthen the down-ramp or add braking. Always test unloaded and then loaded, since load inertia, not the empty shaft, decides the outcome.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Commissioning follows the Siemens manual; stop functions and electrical safety follow IEC 60204-1 / GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Tuning unloaded and shipping loaded: load inertia ten times the empty shaft trips both overcurrent and overvoltage until the lesson lands
② Skipping the parameter save after tuning: one power outage reverts to defaults and the machine overcurrents on restart
③ Stretching only the ramp on a flywheel load: 30 seconds of regeneration fills the bus anyway, a braking resistor is the real answer

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.