MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › Retrofitting a freight elevator with a VFD: a real case with numbers
HomeModels
Table of contents

On this page

Drives & Actuators (102 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Retrofitting a freight elevator with a VFD: a real case with numbers

Old freight elevators run two-speed motors with rough landings and heavy starting current. This page walks a real retrofit: the scheme, the untouched safety circuit, the tuning details and the measured before-and-after data.

1. How it works

A 2-tonne freight elevator with pole-changing two-speed control landed within 30~50mm and started at four times rated current. The retrofit: an 11kW inverter-duty traction motor, a 15kW G-frame drive with 20 percent current margin, encoder closed loop, and the brake interlocked from the drive zero-speed signal. Result: landing accuracy within plus or minus 5mm, starting current 1.2 times rated, and about 20 percent annual energy saving from removing the inefficient low-speed winding.

2. Practice and pitfalls

The safety principle is absolute: safety gear, governor, upward over-speed protection and door locks stay untouched, only the drive control changes. Drive faults feed the elevator stop logic, cutting output and setting the brake, and inspection mode stays below 0.63m/s. Commissioning adds pre-torque compensation calibrated by load tests and a 0.2~0.3m/s creeping segment for levelling. Acceptance ran 20 full trips loaded and empty, all landings within 5mm, noise down from 85dB to 68dB, with parameter backup, tuning records and the inspection report handed over.

3. Freight elevator retrofit key figures

ItemBeforeAfterImprovement
Landing accuracy30~50mmWithin ±5mmSix to ten times better
Starting current4 times rated1.2 times ratedDown 70 percent
Annual energyBaselineAbout 20 percent lessInefficient winding removed
NoiseAbout 85dBAbout 68dBDown 17dB
Creeping speedNone0.2~0.3m/sNew levelling segment
DowntimeNone5 daysIncluding inspection

4. Notes

Freight elevators are regulated equipment: confirm local rules, use a licensed contractor, keep the safety circuit intact with records. Treat the case numbers as feasibility reference, not as copy-paste settings.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Elevator inspection and modification follow GB/T 10058 with machine electrical safety per IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Simplifying the safety circuit to pass checks faster: insurance refuses claims and liability escalates, a real red line
② No pre-torque compensation: the cab dips at brake release and riders complain about the lurch
③ Inspection speed above 0.63m/s: fails the elevator inspection outright

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.

Related reading