Plant circulating water needs steady pressure through the loop while pumps share load, rotate duty and follow the cooling towers. This page covers the control structure, the pressure-point placement, multi-pump changeover logic and the seasonal modes.
The typical layout runs one to three pumps on drives with a 0~1MPa 4~20mA transmitter placed near the hydraulically most remote consumer, not at the pump discharge where flow changes fake the reading. Target pressure follows the process, commonly 0.25~0.4MPa, held within plus or minus 0.01MPa. Multi-pump schemes range from one variable plus fixed-speed helpers to full variable groups; changeover logic adds a pump when the drive sits at 50Hz with low pressure for 30~60 seconds, drops one at the frequency floor with high pressure for 60 seconds, and ramps the variable pump down before any switching to avoid pressure shock.
Duty rotation by accumulated hours every 24~168 hours keeps shaft seals from seizing. The return-water temperature trims the cooling-tower fans independently: speed up above 32C, slow below 28C. Winter adds freeze protection, draining exposed sections and exercising standby pumps weekly. PID settings around P 0.5~2 and I 10~30 seconds suit the slow pressure loop, and because pump power follows roughly the cube of speed, holding the lowest pressure the process accepts saves 25~40 percent, with payback in one to two years.
| Item | Value | Note | Caution |
|---|---|---|---|
| Transmitter | 0~1MPa 4~20mA | At the remote point | Not at pump discharge |
| Target pressure | 0.25~0.4MPa | By process | Within ±0.01MPa |
| Add-pump rule | 50Hz for 30~60s | Pressure still low | Ramp down before adding |
| Drop-pump rule | Floor for 60s | Pressure still high | Avoid pressure shock |
| Rotation | 24~168h | By run hours | Prevents seized seals |
| PID | P0.5~2, I10~30s | Slow loop | Long integral wins |
Commission in order: measure the real pump operating points and network resistance, set the lowest acceptable pressure, then tune the PID. Every extra 0.05MPa of target costs about 8~10 percent in pump power.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Cooling water design per GB/T 50102, machine electrical safety per IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.