MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › Multi-drive speed synchronisation and tension control on winding lines
HomeModels
Table of contents

On this page

Drives & Actuators (102 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Multi-drive speed synchronisation and tension control on winding lines

Unwinding, wire drawing and coating lines need drives that track speed tightly while holding tension steady, and that combination decides the scrap rate. This page covers the speed backbone, the three tension-control methods and the tuning order.

1. How it works

Tension control stands on speed synchronisation: a 0.5 percent speed error between adjacent rolls drifts the tension enough to stretch or wrinkle product. Build the speed chain on a master setpoint with per-unit ratio accuracy of 0.1~0.5 percent, which V/F cannot reach, so vector or encoder closed loop is required. Winding applications add diameter compensation to the speed reference, or tension drifts as the roll grows.

2. Practice and pitfalls

Three tension methods: direct closed loop on a load-cell roller at plus or minus 2~5 percent accuracy and higher cost; indirect torque control computing torque as tension times radius plus friction compensation at plus or minus 5~10 percent, dependent on a good diameter estimate; and the dancer roller, the mid-price mainstay of small and mid lines. Tune in order: speed chain first, then the tension loop, then a step test of 10 percent tension disturbance watching recovery. Verify steady ripple within plus or minus 3 percent and dynamic within 8 percent, and check bearings and roll runout before blaming the algorithm.

3. Tension control methods compared

MethodAccuracyCostTypical useTuning effort
Load cell closed loop±2~5 percentHighCoating and laminatingHigh
Indirect torque±5~10 percentMediumGeneral wind and unwindMedium
Dancer roller±5~8 percentLowSmall and mid linesLow
Ratio speed onlyNo tension loopLowestTension-insensitive websLowest
Magnetic brake±5 percentMediumSmall unwind stationsLow
Accumulator±3 percentHighContinuous line buffersHigh

4. Notes

Fix mechanics before electronics: misaligned rolls, worn bearings and runout defeat any algorithm. Switch product sizes as a whole set of diameter, tension and ratios through parameter groups or PLC recipes.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Machine electrical safety per IEC 60204-1 / GB/T 5226.1; drive practice per IEC 61800-2. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Tuning the tension loop before the speed chain: a skewed reference drifts no matter what, two days wasted
② Fixed roll diameter without live correction: tension overshoots by a third at large diameters and breaks the web
③ Load-cell cable in the power tray: interference makes the tension reading dance and the PID output swings

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.