Every servo drive has two supplies, and getting their division of labour, the power-up and power-down sequences, or the maintenance isolation wrong leads to error logs at best and burnt boards or dropped vertical axes at worst. This page separates the two supplies and sets out the sequences and the isolation drill.
The main supply, single-phase 220V or three-phase 380V on L1/L2/L3, feeds the power stage: rectifier, bus and IGBTs, from a few hundred watts to tens of kilowatts. The control supply, labelled L1C/L2C or Control Power, typically single-phase 220V or 24VDC, feeds the control board, the encoder supply, cooling fans, brake logic and communications. The critical difference: with the main supply off but control power present, the drive is still live as a controller, communicating, logging faults, with the bus slowly discharging behind it. That is why maintenance isolation means both supplies off, then measuring the bus terminals with a meter until they read below 36V; a dark panel only proves the control supply is gone, not the few hundred volts on the bus.
Power up control first, then main: most manuals allow simultaneous, but control first lets self-test and encoder initialisation complete before the bus charges, avoiding initialisation faults. Power down in reverse: disable the servo, let the motor stop, open the main supply, and only then drop the control supply, because cutting control power while the drive holds the brake instantly de-energises it and a vertical axis falls. Two timing rules are hard requirements: 50~100 milliseconds between torque enable and brake release, always build torque before opening the brake, and the same delay between brake engagement and disable. The regen unit self-connects above its bus threshold, about 700V on 380V-class drives, and must never be shorted as a test.
Three wiring faults recur: control power taken from the load side of the main contactor, so every trip kills the brake and the fault log; a shared 24V supply for PLC and drives without the arithmetic, since each drive draws 0.5~1A and an eight-axis system on one 2A supply trips its own protection at power-up, so size with 50 percent margin; and long encoder supply leads whose voltage drop resets the encoder. The isolation drill is fixed sequence: emergency stop, open main switch, open control supply, tag, wait five minutes, measure the bus below 36V, then touch anything. Skipping a step is how maintenance accidents happen.
| Item | Main supply | Control supply | Watch point | Common fault |
|---|---|---|---|---|
| Voltage level | 1-phase 220V / 3-phase 380V | 220VAC or 24VDC | Check the nameplate | 380V unit wired 220V |
| What it feeds | IGBT power stage | Board, encoder, fans | Brake logic is control-side | Brake on wrong supply |
| State after switching off | Bus decays to 0V | Logic still active | Measure the bus | Board work with main off only |
| Power-up order | Second | First | Simultaneous allowed | Main first gives init fault |
| Power-down order | First | Last | Disable servo first | Control off drops brake |
| Capacity, multi-axis | Total power plus margin | 0.5~1A per axis | Add 50 percent margin | Shared supply trips |
Check the power-up wiring against the drawing and the terminal rail axis by axis, write the sequence into a checklist for every cabinet, and enforce the isolation drill: both supplies off, tagged, bus measured below 36V; the manual timing diagram is the final word, brand by brand.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Safety per GB/T 5226.1 / IEC 60204-1, including disconnection and discharge of stored energy; servo drives per GB/T 16439. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.