MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › Main power versus control power in servo drives
HomeModels
Table of contents

On this page

Drives & Actuators (102 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Main power versus control power in servo drives

Every servo drive has two supplies, and getting their division of labour, the power-up and power-down sequences, or the maintenance isolation wrong leads to error logs at best and burnt boards or dropped vertical axes at worst. This page separates the two supplies and sets out the sequences and the isolation drill.

1. How it works

The main supply, single-phase 220V or three-phase 380V on L1/L2/L3, feeds the power stage: rectifier, bus and IGBTs, from a few hundred watts to tens of kilowatts. The control supply, labelled L1C/L2C or Control Power, typically single-phase 220V or 24VDC, feeds the control board, the encoder supply, cooling fans, brake logic and communications. The critical difference: with the main supply off but control power present, the drive is still live as a controller, communicating, logging faults, with the bus slowly discharging behind it. That is why maintenance isolation means both supplies off, then measuring the bus terminals with a meter until they read below 36V; a dark panel only proves the control supply is gone, not the few hundred volts on the bus.

2. Numbers and practice

Power up control first, then main: most manuals allow simultaneous, but control first lets self-test and encoder initialisation complete before the bus charges, avoiding initialisation faults. Power down in reverse: disable the servo, let the motor stop, open the main supply, and only then drop the control supply, because cutting control power while the drive holds the brake instantly de-energises it and a vertical axis falls. Two timing rules are hard requirements: 50~100 milliseconds between torque enable and brake release, always build torque before opening the brake, and the same delay between brake engagement and disable. The regen unit self-connects above its bus threshold, about 700V on 380V-class drives, and must never be shorted as a test.

3. Pitfalls and fixes

Three wiring faults recur: control power taken from the load side of the main contactor, so every trip kills the brake and the fault log; a shared 24V supply for PLC and drives without the arithmetic, since each drive draws 0.5~1A and an eight-axis system on one 2A supply trips its own protection at power-up, so size with 50 percent margin; and long encoder supply leads whose voltage drop resets the encoder. The isolation drill is fixed sequence: emergency stop, open main switch, open control supply, tag, wait five minutes, measure the bus below 36V, then touch anything. Skipping a step is how maintenance accidents happen.

4. Main versus control supply comparison

ItemMain supplyControl supplyWatch pointCommon fault
Voltage level1-phase 220V / 3-phase 380V220VAC or 24VDCCheck the nameplate380V unit wired 220V
What it feedsIGBT power stageBoard, encoder, fansBrake logic is control-sideBrake on wrong supply
State after switching offBus decays to 0VLogic still activeMeasure the busBoard work with main off only
Power-up orderSecondFirstSimultaneous allowedMain first gives init fault
Power-down orderFirstLastDisable servo firstControl off drops brake
Capacity, multi-axisTotal power plus margin0.5~1A per axisAdd 50 percent marginShared supply trips

5. Notes

Check the power-up wiring against the drawing and the terminal rail axis by axis, write the sequence into a checklist for every cabinet, and enforce the isolation drill: both supplies off, tagged, bus measured below 36V; the manual timing diagram is the final word, brand by brand.

6. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Safety per GB/T 5226.1 / IEC 60204-1, including disconnection and discharge of stored energy; servo drives per GB/T 16439. Always check the device datasheet and the product design file for ratings and derating.

7. Cautions

⚠️ Three common pitfalls:
① Control power taken from the load side of the main contactor: every trip drops the brake, the vertical axis slides and work is damaged, with the fault log lost too
② Opening the main supply only before touching the control board: control power is still live and the bus still holds over 300V, and a probe shorts it in a flash
③ One 24V supply shared by eight axes with no sizing: the simultaneous power-up inrush trips the supply into protection, and half a shift is spent blaming the drives

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.