One wrong step in a two-cylinder sequence crashes the mould. This page covers three sequence implementations, position-feedback interlocking, and when to trust time versus position.
Three ways: electrical sequencing with PLC steps confirmed by limit switches, reliable and revisable, the mainstream; pure pneumatic sequencing with sequence valves for explosion-proof duty, inflexible but electric-free; and pure timing, fast but fragile against pressure fluctuation. Principle: position-sensitive steps get switch confirmation, mechanically fixed safe steps may run on time. Hybrid is most common: the main sequence on position feedback, auxiliary actions on timers.
Interlocking in three layers: step interlock, next step blocked until the previous is confirmed; direction interlock, one cylinder may extend only after the other has retracted clear of the interference zone; and mode interlock, manual commands force-cut automatic outputs. Details: mount switches at the confirm position with 5 to 10 mm of mechanical margin, debounce in the PLC for 20 ms, and design a fail-safe home so any stop or air loss resets to the start of the safe sequence. Commission one cylinder at a time, unloaded, verifying each switch point before linking.
Classic errors: taking position signals from hard stops, where overshoot loses the signal and the sequence stalls; interlocks implemented in the HMI instead of PLC logic, defeated by any edit; timing used for position-sensitive pressing, wrecked by a pressure dip; and manual-auto switching without mode interlock, leaving both sides of a double solenoid energised and the spool oscillating. Debug with every step condition and output shown on the HMI, and log supply pressure at stalls: below 0.35 MPa, look at air first.
| Design item | Recommended | Consequence if wrong |
|---|---|---|
| Sequence confirmation | Limit-switch position feedback | Pure timing crashes moulds |
| Step interlock | Hard interlock in PLC logic | HMI interlocks get bypassed |
| Direction interlock | Other cylinder retracted as condition | Both extend and collide |
| Switch placement | Confirm position plus 5 to 10 mm | Overshoot loses signal, stalls |
| Power-loss handling | Reset to safe start | Random restart after outage |
| Commissioning | Single step unloaded first | Straight linking crashes |
Write sequence programs as step engines with entry condition, outputs and timeout per step, alarming on step timeout. Print the sequence diagram and step table for the cabinet so maintenance reads steps, not code.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Control circuit design follows GB/T 5226.1; PLC practice follows the IEC 61131 series; pneumatic sequencing follows GB/T 7932. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.