The joints of steel structures, bridges and towers mostly rely on high-strength bolt friction-type connections to carry shear. Load transfer does not come from bearing on the hole wall but from friction between plates clamped by the preload. If a single bolt is calculated wrongly the joint can slip, or even lose overall stability. Below we work through one steel joint example, then unfold the formulas and parameter tables.
The joint uses M20 high-strength bolts of class 10.9s. From the preload table, the standard preload of an M20 class 10.9s bolt is:
The preload is the “soul” of a friction-type connection — all the clamping force between the plates comes from it. Insufficient tightening torque directly shrinks the friction capacity.
The friction surface is shot-blasted; from the slip coefficient table:
The connection is double shear (two cover plates clamping one core plate), so the number of friction surfaces nf = 2.
The 0.9 coefficient is a reduction that accounts for material and loading deviations. One M20 bolt can carry about 125.6 kN of shear by friction.
The joint carries a design shear force of N = 400 kN:
Round up to 4 bolts, which satisfies the calculation and leaves a detailing margin.
The 4 M20 bolts are arranged symmetrically in 2 rows × 2 columns. Total capacity check:
The capacity margin is about 25.5%. Next verify the net section of the plate (plate width b=200mm, thickness t=12mm, hole diameter d0=22mm):
Final selection: 4 M20 (10.9s) high-strength bolts, 2×2 layout, shot-blasted friction surfaces, double shear connection; both the connection capacity and the plate strength are acceptable.
High-strength bolt connections are divided into two types by load-transfer mechanism,and their calculation models are completely different — never mix them up:
By type, high-strength bolts are divided intolarge hexagon head bolts(class 8.8s and 10.9s) andtorque-shear type bolts(class 10.9s only). The torque-shear type controls the preload by twisting off the spline head at the tail, which gives more stable installation quality. The preload of both bolt types is taken from the GB/T 1228 table.
Parameter notes:
| Symbol | Meaning | Unit |
|---|---|---|
| Nvb | Shear capacity of one bolt | kN |
| nf | Number of friction surfaces (single shear=1, double shear=2) | — |
| μ | Slip coefficient of the friction surface | — |
| P | Preload of the high-strength bolt | kN |
| N | Design shear force of the joint | kN |
| An | Net cross-sectional area of the plate | mm² |
| fu | Tensile strength of the bolt | MPa |
| Ae | Effective cross-sectional area of the bolt | mm² |
| Size | P for class 8.8s (kN) | P for class 10.9s (kN) |
|---|---|---|
| M16 | 80 | 100 |
| M20 | 125 | 155 |
| M22 | 150 | 190 |
| M24 | 175 | 225 |
| M27 | 215 | 290 |
| M30 | 250 | 355 |
| Contact surface treatment method | Q235 | Q355/345 |
|---|---|---|
| Shot blasting (shot peening) | 0.45 | 0.40 |
| Shot blasting (shot peening) followed by inorganic zinc-rich paint | 0.35 | 0.30 |
| Wire brushing to remove loose rust, or as-rolled surfaces not properly cleaned | 0.30 | 0.30 |
⚠️ Important:the slip coefficient has the greatest influence on the capacity. With the same 0.9·nf·P, raising μ from 0.30 to 0.45 increases the capacity per bolt by 50%. The friction surfaces must be prepared as the design requires; painting or oiling them on site is strictly forbidden.
| Item | Minimum | Notes |
|---|---|---|
| Bolt hole diameter d0 | d + 1.5~2.0 mm | Hole diameters for friction type are slightly larger than for bearing type |
| End distance (in the load direction) | 2.0·d0 | Prevents tearing at the end of the member |
| Edge distance (perpendicular to the load) | 1.5·d0 | Values differ for sheared edges and rolled edges |
| Row pitch / column pitch | 3·d0 | Facilitates wrench operation and uniform load transfer |
| Method | Control method | Characteristics |
|---|---|---|
| Torque method | Final tightening torque Tc = K·P·d | Controlled with a torque wrench; K is the torque coefficient (about 0.11~0.15) |
| Turn-of-nut method | Turn a specified angle after snugging (for example 90°~120°) | Preload is controlled by the plastic turn angle, so the scatter is relatively small |
| Torque-shear type bolts | Twisting off the spline head at the tail | Standardized preload, the most reliable in the field |
| # | Common error | Consequence | Correct practice |
|---|---|---|---|
| 1 | Applying the bearing-type formula to a friction-type joint | The capacity per bolt is overestimated by 50%~100% and the joint slips | For friction type always use Nvb = 0.9·nf·μ·P |
| 2 | Using the P value of class 10.9s for a class 8.8s bolt | The clamping force is insufficient and the friction capacity shrinks drastically | P must be looked up in the table in one-to-one correspondence with the property class |
| 3 | Leaving the friction surface rusty, painted or contaminated with oil | μ drops from 0.45 to below 0.30 and the capacity falls off a cliff | Prepare strictly by the specified method and protect the friction surfaces on site |
| 4 | Not checking the net section strength of the plate | The bolts never break — the plate is torn first | σ = N/An ≤ f must be verified as well |
| 5 | Re-tightening a torque-shear bolt with a torque wrench after the head has been twisted off | The preload exceeds the limit and the bolt is destroyed prematurely | Twist off once in a single operation; re-tightening is forbidden |
Keep one mnemonic in mind for high-strength bolt friction-type connections:“Look up the preload, set the friction, multiply 0.9 by the three parameters”— look up the preload P in the table, set the slip coefficient μ according to the friction surface treatment, capacity per bolt = 0.9×nf×μ×P, then calculate the number, lay out the bolts and check the plate. The steel joint will not slip for ten years.