How to Select a Power Transmission System: Screw plus Motor Matched in Five Steps

🛠️ Baisi Technical Handbook · Intelligent selection and calculation for 500+ standard parts
Covers the full range of pneumatic / motor / power transmission / reducer / coupling / bearing / hydraulic / pneumatic / thread / worm / spring parts
Avoid 95% of design errors, improve design efficiency by 80%
Master 10 years of senior engineer experience in 3 months
Download: https://pan.baidu.com/s/1bquayZpfas6oYBbG0gp3Gw?pwd=2giv

📖 Next issue: Cam Profile Design

When a feed axis goes wrong, nine times out of ten the screw was not the wrongly selected part — the screw and the motor were simply not matched: the screw is chosen first and the motor only thought of afterwards, the inertia does not correspond, and the result is a positioning alarm at best, or stick-slip at low speed and vibration at high speed at worst. The correct order for integrated power transmission selection is — first define the duty, then select the screw, and finally back-calculate the motor from the screw, checking the torque and the moment of inertia together. Below we work through a case and then expand into the formulas.

I. Complete Worked Example: Screw and Servomotor Matching for the Z-axis of a Vertical Machining Center

Step 1 · Define the duty conditions

Z-axis (vertical) of a vertical machining center: total mass of the moving parts m=200kg, stroke 500mm, screw support span L=700mm, rapid traverse speed v=300mm/s, acceleration and deceleration time t=0.15s, guide friction coefficient μ=0.02, positioning accuracy requirement ≤0.02mm, motor coupled directly to the screw (i=1).

Step 2 · Calculate the axial working load P
W = m·g = 200 × 9.8 = 1960 N
P = W·(sinα + μ·cosα) = 1960 × (1 + 0) = 1960 N ≈ 1.96 kN

A vertical axis (α=90°) carries the full weight, and the friction term cos90°=0 disappears automatically. A horizontal axis is the opposite: sinα=0, so it carries only the friction component. The P calculated here is the core load shared by the later life, buckling and torque calculations.

Step 3 · Determine the lead Ph (speed and accuracy constraints)
n = v / Ph × 60 = 300 / 10 × 60 = 1800 r/min

Take a lead Ph=10mm. Accuracy check: for a C5 grade screw the lead error coefficient is about 0.1%, so

lead × 0.1% = 10 × 0.001 = 0.01mm ≤ 0.02mm ✓

A larger lead gives a higher speed but also a larger lead error per unit. In applications with tight positioning accuracy (such as grinding machines) the lead must not simply be increased.

Step 4 · Screw life verification (trial selection Ø32×P10)
L10 = (Ca / (fw·P))³ × 10⁶ = (30 / (1.2×1.96))³ × 10⁶ ≈ 2.08 × 10⁹ revolutions
Lh = L10 / (60·n) = 2.08×10⁹ / (60×1800) ≈ 19200 h ≥ 10000 h ✓

For Ø32×P10 the basic dynamic load rating Ca=30kN (static load rating C0a=57kN), and the load factor fw=1.2 (general running). A life of nearly 20 000 hours comfortably exceeds the 10 000 hour acceptance line of a machine tool.

Step 5 · Critical speed and column buckling verification
Ncr = Ks·dr·10⁷ / L² = 21.9 × 27.3 × 10⁷ / 700² ≈ 12200 r/min
Pcr = Kb·dr⁴ / L² = 400 × 27.3⁴ / 700² ≈ 453 kN

dr is the screw root diameter of 27.3mm. The critical speed must be ≥ working speed × 1.2 (12200 ≥ 2160 ✓) to avoid resonance; the critical buckling load must be ≥ working load × 2 (453 ≥ 3.92 ✓); the static safety factor C0a/P = 57/1.96 ≈ 29 ≥ 2 ✓.

Step 6 · Calculate the referred moment of inertia J
Jload = m × (Ph / 2π)² = 200 × (10 / 62.8)² ≈ 5.1 kg·cm²
Jscrew = ½ · mb · r² = ½ × 3.15 × 1.365² ≈ 2.9 kg·cm²
Jtotal = 5.1 + 2.9 ≈ 8.0 kg·cm²

The load inertia is referred by the square of the lead (the larger the lead, the larger the referred inertia); the screw is treated as a solid cylinder with J=½mr². The total inertia is the decisive input to the motor selection, and many "undersized" selections come from omitting the screw inertia.

Step 7 · Torque and inertia ratio verification, and motor selection
TL = P · (Ph/2π) / η = 1960 × 0.00159 / 0.9 ≈ 3.47 N·m
Ta = J·2π·n/(60·t) = 8.0×10⁻⁴ × 6.283 × 1800/(60×0.15) ≈ 1.01 N·m
Tpeak = Ta + TL ≈ 3.47 + 1.01 = 4.48 N·m

Select a 1.0 kW servomotor: rated torque 4.77N·m ≥ TL=3.47N·m; maximum torque 14.3N·m ≥ Tpeak=4.48N·m; rated speed 3000r/min ≥ 1800r/min; inertia ratio (8.0+3.4)/3.4 ≈ 3.4, far below the limit of 30.

Final selection result: Ø32×P10 ball screw plus a 1.0kW servomotor (with a power-off brake); all four verifications of the screw and the motor pass and the integrated selection is acceptable.

🛠️ Stop paging through handbooks

The Baisi Technical Handbook has integrated this calculation module into the Group 1 Query System calculation module. Enter the duty parameters and it automatically outputs the selection result. Say goodbye to paging through handbooks, to hand calculations and to rule-of-thumb estimates. —— Baisi Technical Handbook download https://pan.baidu.com/s/1bquayZpfas6oYBbG0gp3Gw?pwd=2giv

II. The Four-Step Closed Loop of Transmission System Selection

Integrated selection is not simply stacking several modules together; it is a closed-loop chain with a strict order. Get the order wrong and rework follows:

StepWhat is doneOutputKey criterion
① Duty inputMass, stroke, speed, acceleration and deceleration time, friction, mounting angle, accuracyDuty parameter tableNot one item may be missed
② Screw selectionFix the lead → verify life, critical speed, buckling and accuracyScrew specification Ø×PLife ≥10000h; Ncr≥1.2n; Pcr≥2P
③ Motor selectionBack-calculate the speed, inertia and torque from the selected screwMotor power and modelInertia ratio ≤30; peak torque ≤ maximum torque
④ Integrated verificationThe screw and the motor must pass all four checks simultaneouslySelection conclusionAll pass → accepted
⚠️ The order must not be reversed: the motor must be "back-calculated from the screw", not chosen first and the screw then made to fit. Change the lead and the speed, the referred inertia and the torque all change with it, so choosing the motor first is digging a hole for yourself.

III. Core Calculation Formulas

1. Axial working load

P = W·(sinα + μ·cosα),W = m·g

α is the angle between the screw and the horizontal. A vertical axis takes the full weight and a horizontal axis only the friction component. If there is a cutting force or an external resistance, add it to P.

2. Ball screw life

L10 = (Ca/(fw·P))³ × 10⁶ (revolutions),Lh = L10/(60·n)

Ca is the basic dynamic load rating and fw the load factor (smooth 1.0~1.2, general 1.2~1.5, impact 1.5~2.0). Machine tools generally require Lh ≥ 10000~20000h.

3. Critical speed and column buckling stability

Ncr = Ks·dr·10⁷ / L² (r/min)
Pcr = Kb·dr⁴ / L² (kN)

L is the support span (mm) and dr the screw root diameter (mm). Ks/Kb are set by the support arrangement: fixed-fixed 21.9/400, fixed-supported 15.1/200, fixed-free 3.4/50.

4. Referred moment of inertia and torque

J = m(Ph/2π)² + ½mbr²
TL = P·(Ph/2π)/η,Ta = J·2πn/(60t),Tpeak = Ta+TL

Note the unit consistency: J in kg·m² (1 kg·cm² = 10⁻⁴ kg·m²), Ph in m, and η taken as 0.85~0.9 (covering the screw and the guide).

5. Parameter description table

SymbolMeaningUnitHow it is determined
mTotal mass of the moving partskgCompiled from the mechanical structure
PhScrew leadmmBack-calculated from the speed and the accuracy
Ca / C0aBasic dynamic / static load ratingkNLooked up in the screw catalogue
drScrew root diametermmGiven in the catalogue (about 0.85D)
JrotorMotor rotor inertiakg·cm²Looked up in the motor catalogue
Inertia ratio(Jtotal+Jrotor)/Jrotor—Requirement ≤30, recommended ≤10

IV. Design Parameter Selection Guide

Values of the load factor fw

Operating conditionsSpeedfw
No impact, smooth (such as a measuring table)Low speed v≤15m/min1.0~1.2
General industrial machinery (such as a machining center)Medium speed 15~60m/min1.2~1.5
Impact, frequent reversalHigh speed v>60m/min1.5~2.0

Screw support arrangements and coefficients

Support arrangementKs (critical speed)Kb (buckling)Applicability
Fixed-fixed21.9400High speed, high rigidity, angular contact bearings at both ends
Fixed-supported15.1200The most common, one end fixed and one end deep groove ball
Fixed-free3.450Short stroke vertical axes, vertical use only

Recommended inertia ratios and positioning accuracy

ApplicationRecommended inertia ratioLead accuracy grade
General feed axis (general accuracy)≤10C7 (±0.05/300mm)
Machining centers, precision positioning≤5C5 (±0.023/300mm)
Grinding machines, measuring equipment, ultra-precision positioning≤3C3 (±0.008/300mm)
⚠️ A vertical axis must use a servomotor with a power-off brake. The brake is a safety item, not an "optional accessory"; on a power failure it holds the load and prevents it from falling.

V. Common Errors and How to Avoid Them

Common errorConsequenceCorrect practice
Choosing the lead on speed alone and not verifying the accuracyThe positioning accuracy is not met and the machined dimensions are out of tolerancelead × 0.1% ≤ accuracy requirement
Only thinking of the motor after the screw is chosenThe inertia and the torque all have to be recalculated, with repeated reworkDuty → screw → back-calculate the motor
Omitting the screw's own moment of inertiaThe inertia ratio is falsely low, giving a start-up alarm and stick-slip at low speedJ=½mr², and include the screw inertia in the total
Forgetting the weight on a vertical axis and forgetting the brakeThe motor is undersized and the load falls on power failure, injuring peopleα=90° takes the full weight, and a brake is mandatory
Calculating only the life and not verifying the critical speedResonance at high speed, with the screw bending and vibratingNcr ≥ 1.2×working speed

Integrated power transmission selection is essentially a four-step closed loop: "duty → screw → motor → integrated verification". First calculate the axial load, then fix the lead and verify the life, critical speed and buckling, then back-calculate the motor speed, referred inertia and torque from the selected screw, and finally the screw and motor must pass all four checks simultaneously. Get the order right and it is matched in one pass.