When a feed axis goes wrong, nine times out of ten the screw was not the wrongly selected part — the screw and the motor were simply not matched: the screw is chosen first and the motor only thought of afterwards, the inertia does not correspond, and the result is a positioning alarm at best, or stick-slip at low speed and vibration at high speed at worst. The correct order for integrated power transmission selection is — first define the duty, then select the screw, and finally back-calculate the motor from the screw, checking the torque and the moment of inertia together. Below we work through a case and then expand into the formulas.
Z-axis (vertical) of a vertical machining center: total mass of the moving parts m=200kg, stroke 500mm, screw support span L=700mm, rapid traverse speed v=300mm/s, acceleration and deceleration time t=0.15s, guide friction coefficient μ=0.02, positioning accuracy requirement ≤0.02mm, motor coupled directly to the screw (i=1).
A vertical axis (α=90°) carries the full weight, and the friction term cos90°=0 disappears automatically. A horizontal axis is the opposite: sinα=0, so it carries only the friction component. The P calculated here is the core load shared by the later life, buckling and torque calculations.
Take a lead Ph=10mm. Accuracy check: for a C5 grade screw the lead error coefficient is about 0.1%, so
A larger lead gives a higher speed but also a larger lead error per unit. In applications with tight positioning accuracy (such as grinding machines) the lead must not simply be increased.
For Ø32×P10 the basic dynamic load rating Ca=30kN (static load rating C0a=57kN), and the load factor fw=1.2 (general running). A life of nearly 20 000 hours comfortably exceeds the 10 000 hour acceptance line of a machine tool.
dr is the screw root diameter of 27.3mm. The critical speed must be ≥ working speed × 1.2 (12200 ≥ 2160 ✓) to avoid resonance; the critical buckling load must be ≥ working load × 2 (453 ≥ 3.92 ✓); the static safety factor C0a/P = 57/1.96 ≈ 29 ≥ 2 ✓.
The load inertia is referred by the square of the lead (the larger the lead, the larger the referred inertia); the screw is treated as a solid cylinder with J=½mr². The total inertia is the decisive input to the motor selection, and many "undersized" selections come from omitting the screw inertia.
Select a 1.0 kW servomotor: rated torque 4.77N·m ≥ TL=3.47N·m; maximum torque 14.3N·m ≥ Tpeak=4.48N·m; rated speed 3000r/min ≥ 1800r/min; inertia ratio (8.0+3.4)/3.4 ≈ 3.4, far below the limit of 30.
Final selection result: Ø32×P10 ball screw plus a 1.0kW servomotor (with a power-off brake); all four verifications of the screw and the motor pass and the integrated selection is acceptable.
The Baisi Technical Handbook has integrated this calculation module into the Group 1 Query System calculation module. Enter the duty parameters and it automatically outputs the selection result. Say goodbye to paging through handbooks, to hand calculations and to rule-of-thumb estimates. —— Baisi Technical Handbook download https://pan.baidu.com/s/1bquayZpfas6oYBbG0gp3Gw?pwd=2giv
Integrated selection is not simply stacking several modules together; it is a closed-loop chain with a strict order. Get the order wrong and rework follows:
| Step | What is done | Output | Key criterion |
|---|---|---|---|
| ① Duty input | Mass, stroke, speed, acceleration and deceleration time, friction, mounting angle, accuracy | Duty parameter table | Not one item may be missed |
| ② Screw selection | Fix the lead → verify life, critical speed, buckling and accuracy | Screw specification Ø×P | Life ≥10000h; Ncr≥1.2n; Pcr≥2P |
| ③ Motor selection | Back-calculate the speed, inertia and torque from the selected screw | Motor power and model | Inertia ratio ≤30; peak torque ≤ maximum torque |
| ④ Integrated verification | The screw and the motor must pass all four checks simultaneously | Selection conclusion | All pass → accepted |
α is the angle between the screw and the horizontal. A vertical axis takes the full weight and a horizontal axis only the friction component. If there is a cutting force or an external resistance, add it to P.
Ca is the basic dynamic load rating and fw the load factor (smooth 1.0~1.2, general 1.2~1.5, impact 1.5~2.0). Machine tools generally require Lh ≥ 10000~20000h.
L is the support span (mm) and dr the screw root diameter (mm). Ks/Kb are set by the support arrangement: fixed-fixed 21.9/400, fixed-supported 15.1/200, fixed-free 3.4/50.
Note the unit consistency: J in kg·m² (1 kg·cm² = 10⁻⁴ kg·m²), Ph in m, and η taken as 0.85~0.9 (covering the screw and the guide).
| Symbol | Meaning | Unit | How it is determined |
|---|---|---|---|
| m | Total mass of the moving parts | kg | Compiled from the mechanical structure |
| Ph | Screw lead | mm | Back-calculated from the speed and the accuracy |
| Ca / C0a | Basic dynamic / static load rating | kN | Looked up in the screw catalogue |
| dr | Screw root diameter | mm | Given in the catalogue (about 0.85D) |
| Jrotor | Motor rotor inertia | kg·cm² | Looked up in the motor catalogue |
| Inertia ratio | (Jtotal+Jrotor)/Jrotor | — | Requirement ≤30, recommended ≤10 |
| Operating conditions | Speed | fw |
|---|---|---|
| No impact, smooth (such as a measuring table) | Low speed v≤15m/min | 1.0~1.2 |
| General industrial machinery (such as a machining center) | Medium speed 15~60m/min | 1.2~1.5 |
| Impact, frequent reversal | High speed v>60m/min | 1.5~2.0 |
| Support arrangement | Ks (critical speed) | Kb (buckling) | Applicability |
|---|---|---|---|
| Fixed-fixed | 21.9 | 400 | High speed, high rigidity, angular contact bearings at both ends |
| Fixed-supported | 15.1 | 200 | The most common, one end fixed and one end deep groove ball |
| Fixed-free | 3.4 | 50 | Short stroke vertical axes, vertical use only |
| Application | Recommended inertia ratio | Lead accuracy grade |
|---|---|---|
| General feed axis (general accuracy) | ≤10 | C7 (±0.05/300mm) |
| Machining centers, precision positioning | ≤5 | C5 (±0.023/300mm) |
| Grinding machines, measuring equipment, ultra-precision positioning | ≤3 | C3 (±0.008/300mm) |
| Common error | Consequence | Correct practice |
|---|---|---|
| Choosing the lead on speed alone and not verifying the accuracy | The positioning accuracy is not met and the machined dimensions are out of tolerance | lead × 0.1% ≤ accuracy requirement |
| Only thinking of the motor after the screw is chosen | The inertia and the torque all have to be recalculated, with repeated rework | Duty → screw → back-calculate the motor |
| Omitting the screw's own moment of inertia | The inertia ratio is falsely low, giving a start-up alarm and stick-slip at low speed | J=½mr², and include the screw inertia in the total |
| Forgetting the weight on a vertical axis and forgetting the brake | The motor is undersized and the load falls on power failure, injuring people | α=90° takes the full weight, and a brake is mandatory |
| Calculating only the life and not verifying the critical speed | Resonance at high speed, with the screw bending and vibrating | Ncr ≥ 1.2×working speed |
Integrated power transmission selection is essentially a four-step closed loop: "duty → screw → motor → integrated verification". First calculate the axial load, then fix the lead and verify the life, critical speed and buckling, then back-calculate the motor speed, referred inertia and torque from the selected screw, and finally the screw and motor must pass all four checks simultaneously. Get the order right and it is matched in one pass.