E41-207 · Guide Rail Selection · Guide Installation After Equipment Repair · ★★★
After a major overhaul the guide was reinstalled; 3 months later the slider showed markedly higher resistance at a certain position. Inspection found a ~20 mm scratch on the base (depth ~0.02 mm) with surrounding metal raised ~0.01 mm.
During repair, after removing the old guide, the base was scratched by a pry bar (width ~1 mm, depth ~0.02 mm). Metal on both sides of the scratch bulged ~0.01 mm from plastic deformation. After installing the new guide, the guide bottom is raised 0.01 mm at the bulge, creating a local hump. As the slider passes the hump, the balls carry extra load (~30% more) and motion resistance increases. Long-term, the guide raceway in that area wears faster, forming a wear groove ~0.005 mm deep.
① Base scratches must be repaired: first stone down the bulge, then lap with a surface plate\n② Repair standard: scratch depth ≤ 0.005 mm, no surrounding bulge\n③ Deep scratches (>0.05 mm) need build-up welding then re-machine the base\n④ When removing the old guide, never use a pry bar; use jack screws or a puller\n⑤ Before reinstalling the guide, check base flatness with a surface plate + feeler gauge
FT_10_Linear Guideway Selection