E41-037 · Cylinder and Hydraulic Selection · High-Speed Assembly-Line Sorting Cylinder · ★★
When the cylinder extends to the end of stroke it produces a loud metallic impact noise (>85 dB); after 3 months the piston-rod end connector loosens and cracks appear in the mounting-bracket weld.
Cylinder speed v = 0.8 m/s, total moving mass m = 3 kg (piston + piston rod + work head + workpiece); kinetic energy E_k = ½mv² = ½×3×0.64 = 0.96 J. The cylinder's built-in cushion allows a maximum absorbed energy (per catalog data) of cushion stroke × cushion force × efficiency = 0.015 m × 120 N × 0.5 = 0.9 J, but the actual kinetic energy of 0.96 J already exceeds this capacity. Moreover, with service time the cushion seal wears and cushion efficiency drops to 0.4, reducing absorbable energy to 0.72 J - an overshoot of 34%. A standard cylinder was selected without verifying its cushion capacity against the actual mass × velocity product.
① Kinetic-energy calculation: E_k = ½ × m × v² = 0.5×3×0.64 = 0.96 J
② Cylinder cushion capacity check: E_buff = F_buff × s_buff × η_buff
③ The built-in cushion is insufficient in this case; an external hydraulic shock absorber must be added
④ ACE MC150MH (absorbs 3.5 J/stroke, far above 0.96 J, safety factor 3.6)
⑤ Shock-absorber mounting: install an absorber bracket at the cylinder end of stroke, with the absorber axis aligned with the motion direction
⑥ Or switch to a larger cylinder with adjustable cushioning, e.g. SMC CJ2 series with air cushion (absorption capacity up to 2.5 J)
⑦ Set a deceleration valve: engage the deceleration circuit 30 mm before end of stroke, reducing end speed to 0.2 m/s and kinetic energy to 0.06 J
FT_31_Pneumatic System Design