E41-779 · Other Selection · Incomplete Pipeline Flushing · ★★★★
The servo valve of a newly installed hydraulic servo system jammed during commissioning; oil sampling was NAS grade 11 (requirement ≤7), containing metal particles (5–50 μm).
The hydraulic pipeline (seamless steel tube 20#, DN25, total 50 m) was only blown out with compressed air after installation (no acid pickling, no circulation flushing). Weld slag, rust, and machining chips inside the pipe (from cutting and welding) were carried by the purge air to the pipe end → into the servo valve. The servo valve throttling-edge clearance is about 2–5 μm; 5–50 μm particles lodge in the spool clearance → spool cannot shift → stuck. Standard practice: acid pickle the pipe (remove scale and grease) → passivate (form a protective film) → circulation flush (use a flushing plate in place of the servo valve, oil temperature 50–60 ℃, flush until NAS ≤ grade 7, then install the servo valve after sampling confirms compliance). Omitting acid pickling and circulation flushing, the two key steps, was the root cause.
① Recheck all parameters per correct selection specifications
② Confirm that operating loads, environment, and service life all meet design requirements
③ Select reliable brands and appropriate models
④ Verify installation and operating conditions
⑤ Perform periodic inspection and maintenance after commissioning