E41-849 · Belt Drive Selection · Ball Mill Auxiliary Drive · ★★★★
On the auxiliary drive of a ball mill (30 kW, starting torque up to 3×) the V-belt slipped continuously after one month of running and stretched irrecoverably, forcing a production cut.
First, the starting torque T_s = 3·9550·30/980 = 877 N·m, three times the rated value; the instantaneous effective pull F_e_s = 2T_s/d1 = 2·877/0.25 = 7018 N far exceeded the steady-state F_e = 1000·30/12.5 = 2400 N. Second, F_e_s stretched the belt elastically by δ_e = F_e_s·L/(E·A) = 7018·1.6/(200e6·294e-6) = 0.19 m = 190 mm, far beyond the tensioning range; the belt was pulled out of the groove and permanently stretched plastically. Third, the plastic elongation lowered F0 so that even the steady state slipped, a vicious circle. Root cause: the starting peak torque was not checked.
① With a high starting torque (>2×), select for the starting peak: double or triple the number of belts, or switch to narrow V-belts
② Use high-modulus belts (polyester / aramid cords) to reduce starting elongation
③ Switch to a hydraulic coupling / VFD soft start to clip the T_s peak to within 1.5×
④ Provide a long tensioner travel (≥ 2% of belt length) to compensate elongation
⑤ At selection, check F_e_max ≥ F_e_s and leave a margin
⑥ Standard belts are forbidden for heavy starting loads
⑦ Add soft starting plus tensioner-travel monitoring