E42-259 · Vibration and Resonance · Hydraulic System Steel Piping · ★★
High-pressure line shakes during pump start/stop; fittings seep oil; line clamp shows wall vibration marks.
[Flow-Induced Vibration] Flow velocity v=6m/s inside pipe; clamp spacing 1.5m long span induces lateral vibration f=35Hz. [Fatigue Leakage] Pipe fitting alternating stress σ=180MPa; repeated loosening and oil seepage. [Design Omission] Pipe clamp spacing too large; no damping added.
1. Reduce pipe clamp spacing from 1.5m to 0.8m.\n2. Add fixed anti-vibration clamps at elbows.\n3. Add rubber damping sleeve to piping.\n4. Limit flow velocity to ≤4m/s.\n5. Use 24° cone metal-to-metal seal at fittings.\n6. Add accumulator at pump outlet to suppress pulsation.\n7. Shift-point leak patrol.\n8. Retorque pipe clamps.
GB/T 3766-2015