Knowledge Base › Structural Design Error Case Study › Hoisting Wire Rope Bending Fatigue Wire Breaks

Hoisting Wire Rope Bending Fatigue Wire Breaks

E42-337 · Fatigue Fracture · Hoisting Wire Rope · ★★★

Problem Description

32t crane wire rope (Φ20, 6×37) in service wire breaks exceed 10%; rope break risk; 2 ropes replaced per month

Root Cause

[Bending Fatigue] Sheave ratio D/d=16 (should be ≥20); bending stress σ=320MPa exceeds fatigue limit.
[Wire Breaks] Life halves; wire breaks cluster.
[Design Omission] Sheave ratio not controlled; not lubricated; safety factor only 1.2 (should be ≥3.5).

Corrective Solution

1) Raise sheave ratio to ≥20;
2) Periodic lubrication to reduce friction;
3) Install online wire break monitoring;
4) Scrapping criterion at 10% wire breaks;
5) Visual inspection each shift;
6) Limit rated load;
7) Align guide pulley;
8) Periodic forced replacement.

Checklist

Reference

GB/T 5972-2016