MOULDLKnowledge Base3D Model DownloadsMembership
中文版Model Store »
HomeModels
Table of contents

Knowledge Base Home

📐 Standard Data

🧮 Calculators

📖 Selection Guides

🏭 Material Grades

❓ Engineer FAQ

🗂 Quick-Reference Categories

❌ Error Case Studies

📚 Technical Articles

Knowledge Base › Structural Design Error Case Study › Preload Decay and Flash on Injection-Molding Machine Tie-Bar Nuts

Preload Decay and Flash on Injection-Molding Machine Tie-Bar Nuts

E42-406 · Threaded Fastener Loosening · MAKE4500 Injection-Molding Machine Tie Bar · ★★★

Problem Description

MAKE4500 injection machine (4500t) tie-bar M130 nuts decay preload 18%; platen parallelism 0.25mm exceeds the 0.1 allowance; flash repaired 4 times per month

Root Cause

[Decay] Clamp impact makes nuts turn and preload drop. [Flash] Uneven mold locking causes material to flash at the parting face. [Design Omission] No hydraulic tightening, no stop; safety factor 1.3 (should be ≥1.6).

Corrective Solution

1) Switch nuts to hydraulic tensioning preload;
2) Add disc springs to compensate decay;
3) Set rotation stop;
4) Adjust platen parallelism ≤0.1mm;
5) Retighten each shift;
6) Add preload monitoring;
7) Limit mold-closing speed;
8) Replace at end of life.

Checklist

Reference

GB/T 25157-2010

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL