MOULDLKnowledge Base3D Model DownloadsMembership
中文版Model Store »
HomeModels
Table of contents

Knowledge Base Home

📐 Standard Data

🧮 Calculators

📖 Selection Guides

🏭 Material Grades

❓ Engineer FAQ

🗂 Quick-Reference Categories

❌ Error Case Studies

📚 Technical Articles

Knowledge Base › Structural Design Error Case Study › Connecting Rod Overload Bending

Connecting Rod Overload Bending

E42-533 · Impact and Overload Fracture · Crank Press (630t) · ★★★

Problem Description

Connecting rod φ90; over-adjustment overload bent; large clearance; scrapped; 3 parts scrapped per month

Root Cause

[Overload Bending] P=800t> rated 630; buckled and bent.
[Instability] Large slenderness ratio.
[Design Omission] No limit, no calculation; safety factor 1.0 (should be ≥1.5).

Corrective Solution

1) Provide overload protection;
2) Enlarge the connecting rod;
3) Limit tonnage;
4) Bend check each shift;
5) Limit stroke;
6) Raise strength;
7)NDE;
8) Periodic re-measurement.

Checklist

Reference

GB/T 10923-2009

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL