E43-053 · Improper Clearance Fit · Steam Isolation Valve · ★★
Designed clearance between stem and gland was 0.10mm but measured 0.28mm; packing was blown out, causing leakage and 3 shutdowns
[Large Clearance] The design clearance was 0.10mm, but stem roundness was out of tolerance by 0.05, so the local clearance reached 0.28mm.
[Blow-out] High-pressure steam rushed along the gap and blew the packing apart, defeating the seal.
[Design Omission] The clearance should be limited to H11/d11 with a throttle sleeve added, but neither stem roundness nor packing compression was controlled.
1) Reduce the stem-to-gland clearance to H11/d11 (0.10mm) to limit leakage;
2) Control stem roundness to ≤0.01mm to preserve the sealing surface;
3) Add a throttle sleeve to lengthen the leakage path;
4) Compress the packing in layers to prevent it loosening and backing off;
5) Tighten the gland bolts uniformly at 80N·m;
6) Nitride the stem to hardness ≥600HV for wear resistance;
7) Monitor leakage online for early warning;
8) Replace the packing periodically to preserve sealing.
GB/T 12224-2015 Steel Valves