E43-148 · Improper Clearance Fit · Pipeline Expansion Joint · ★
The clearance between the bellows and the pipe end was designed at 0.02mm but measured 0.10mm; the weld seam leaked the medium
[Large Clearance] The design clearance was 0.02mm, but the oversize pipe end bore made the actual clearance 0.10mm.
[Leakage] With the large clearance the weld seam was not fully penetrated and the medium leaked through.
[Design Omission] The clearance should have been controlled to ≤0.03mm with full penetration welding, but the assembly was not controlled.
1) Control the clearance to ≤0.03mm;
2) Control the pipe end bore tolerance;
3) Inspect the full penetration weld by NDT;
4) Perform an air pressure test;
5) Verify the weld against the clearance;
6) Check for leakage periodically;
7) Verify the expansion capacity;
8) Inspect by NDT every batch.
GB/T 12777-2019 Metal Bellows Expansion Joints