MOULDLKnowledge Base3D Model DownloadsMembership
中文版Model Store »
HomeModels
Table of contents

Knowledge Base Home

📐 Standard Data

🧮 Calculators

📖 Selection Guides

🏭 Material Grades

❓ Engineer FAQ

🗂 Quick-Reference Categories

❌ Error Case Studies

📚 Technical Articles

Knowledge Base › Tolerance and Fit Error Case › Packaging Multi-Station Accumulation

Packaging Multi-Station Accumulation

E43-479 · Dimensional-Chain Accumulation · Packaging line station spacing designed 400±0.2, measured 403 after 5 stations · ★★

Problem Description

Multi-station accumulation made spacing 3mm out of tolerance, shifting bag positions.

Root Cause

[Mechanism] Multi-station installation dimensional chain accumulated, so the closed loop (station spacing) went out of tolerance.
[Calculation] T0=ΣTi=5×0.6=3, 15× the 0.2 allowance.
[Design Omission] No adjustment or unified datum; design defect -> station spacing out of tolerance.

Corrective Solution

1) Provide a shim to absorb accumulation;
2) Match-machine each station per T0/√5;
3) Unify the datum;
4) Statistical check;
5) Selective matching by measurement;
6) Leave grinding stock;
7) Laser check;
8) First-article station spacing measured ≤0.2.

Checklist

Reference

GB/T 5847-2004 Dimensional chain — Calculation method

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL