MOULDLKnowledge Base3D Model DownloadsMembership
中文版Model Store »
HomeModels
Table of contents

Knowledge Base Home

📐 Standard Data

🧮 Calculators

📖 Selection Guides

🏭 Material Grades

❓ Engineer FAQ

🗂 Quick-Reference Categories

❌ Error Case Studies

📚 Technical Articles

Knowledge Base › Tolerance and Fit Error Case › Lifting Multi-Section Boom Accumulation

Lifting Multi-Section Boom Accumulation

E43-481 · Dimensional-Chain Accumulation · Truck crane 3-section boom reach designed 10000±2, measured 10015 · ★★

Problem Description

Multi-section boom gap accumulation made reach 15mm out of tolerance, shifting placement.

Root Cause

[Mechanism] Multi-section slide-block gap chain accumulated, so the closed loop (reach) went out of tolerance.
[Calculation] T0=√(3×8.7²)=15, 7.5× the 2 allowance.
[Design Omission] No adjustment or match-machining; design defect → reach out of tolerance.

Corrective Solution

1) Provide a shim to absorb accumulation;
2) Match-machine each section per T0/√3;
3) Unify the datum;
4) Statistical check;
5) Selective matching by measurement;
6) Leave grinding stock;
7) Distance meter check;
8) First-article reach measured ≤2.

Checklist

Reference

GB/T 3811-2008 Design rules for cranes

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL