E44-1102 · Other · Backwash · ★★
Wrongly opened, short, low efficiency.
[Mechanism] The backwash sequence had no interlock; an in-service accidental opening interrupted the filtration cycle and raised effluent turbidity.
[Calculation] Normal filtration cycle 24h; an accidental opening interrupted it after only 3h; effluent turbidity rose from 1NTU to 5NTU.
[Design Omission] No interlock, no sequence check, no confirmation, and no sequence test.
1) Provide an interlock against error (lock backwash while in service); an accidental opening shortens the cycle, and the interlock locks it, restoring the sequence;
2) Check the sequence timing (24h/cycle); an error causes mis-action, and an accurate sequence stabilizes the cycle;
3) Add a confirmation button (double confirmation before opening); an error opens it, and confirmation prevents it;
4) Control timing (staggered backwash); confused timing causes error, and time control sequences it, preventing conflict;
5) Run a sequence test (100% cycle-meet rate); untested means unknown, and measured sequence confirms it;
6) Install status monitoring (alarm on accidental opening); an error first shows as a valve opening, and early warning catches it;
7) Set a calibration interval (monthly); long intervals cause error, and controlled intervals calibrate, preventing in-service error;
8) Record interlock and sequence check on the backwash drawing; the root cause of error was no interlock and a wrong sequence, so the drawing must gate it.
GB/T 50050-2017 Industrial circulating cooling water