E44-362 · Water Hammer and Pressure Surge · Pressure-tank precharge wrong · ★★
A precharge of 0.6MPa (should be 0.3) made the air chamber too small, weakened wave absorption, and at pump shutdown Δp=1.2MPa exceeded the allowable limit.
[Mechanism] An excessive precharge shrinks the effective air chamber and weakens wave absorption.
[Calculation] Δp=1.2 exceeded the allowable limit.
[Design Omission] The precharge was not set from the system static pressure and was never checked, so the precharge was wrong.
1) Adjust the precharge to 0.9 times the system static pressure (about 0.3MPa), because 0.6 shrank the air chamber, weakened absorption and drove Δp=1.2 beyond the limit; hence correct precharge to enlarge the chamber;
2) Check the precharge against the static pressure formula, because an over-high precharge loses effectiveness; hence accurate precharge;
3) Periodically measure the precharge to catch deviations early, because drift causes error; hence pressure testing;
4) Check post-absorption Δp≤allowable, because the uncalculated value exceeded the limit; hence accurate calculation;
5) Provide a standby twin tank, because a single tank is ineffective; hence dual protection;
6) Close first and then stop the pump, because a direct stop generates a large wave; hence close first;
7) Raise the tank rating, because overpressure cracks it; hence higher rating;
8) Put precharge into the maintenance schedule, because the wrong precharge was the root cause of weak absorption; hence maintenance control.
GB/T 32284-2015 Code for design of pump stations - Water hammer protection