E44-420 · Two-Phase Flow and Gas Binding · Pipe Slope 0.001 Too Shallow · ★★
A slope of only 0.001 is too shallow to vent gas well, so gas builds up along the run, the flow drops 20%, and the pump suction cavitates.
[Mechanism] A shallow slope keeps gas from rising and it builds up along the line.
[Calculation] Gas buildup cuts the flow by 20% and causes cavitation.
[Design Omission] The pipe was not sloped for venting and no vents were fitted — the cause of the shallow-slope gas buildup.
1) Raise the slope to ≥0.003 so gas rises; 0.001 lets gas build up, cuts flow 20% and cavitates, so slope the line for venting;
2) Add vent valves at low points as backup; an insufficient slope still accumulates gas, so add supplementary venting;
3) Install a gas header tank for centralized venting; scattered vents are hard to drain, so collect the gas;
4) Keep air out of the pump suction, since air causes cavitation, preventing air ingestion;
5) Check the linewise gas-related loss; gas buildup causes loss, so account for it fully;
6) Monitor flow to catch the drop early; buildup is gradual, so watch the flow;
7) Vent periodically; buildup is gradual, so vent and inspect;
8) Write the slope into the layout; the original shallow slope was the root cause of buildup, so gate it at layout stage.
GB/T 5657-2013 Technical specifications for centrifugal pumps