E44-436 · Two-Phase Flow and Gas Binding · Vacuum Line Leak · ★★
Leaks in the vacuum line draw in air, dropping the vacuum from -0.095 to -0.06MPa, and the pumping speed becomes insufficient.
[Mechanism] The leak draws in air and drops the vacuum.
[Calculation] At -0.06MPa the pumping speed is insufficient.
[Design Omission] No leak testing and no sealing were maintained — the cause of the leak-induced vacuum binding.
1) Helium-mass-spec leak-test and replace the seals; the leak drops vacuum from -0.095 to -0.06 and starves pumping speed, so leak-test and re-seal to restore vacuum;
2) Use metal gaskets at the flanges to prevent leaks; soft gaskets leak easily, so switch to metal;
3) Add a vacuum alarm to catch the drop early; it decays gradually, so alarm it;
4) Periodically hold-pressure and leak-test; leaks progress gradually, so hold pressure;
5) Reduce the number of flanges in the line; more flanges mean more leak points, so cut them;
6) Upsize the pump speed to compensate for the leak; the leak robs speed, so increase it;
7) Fit a bypass to isolate the leaking section; a leaky section is a hazard, so isolate it;
8) Write leak testing into maintenance; the original lack of it was the root cause of the vacuum drop, so gate it in maintenance.
GB/T 5657-2013 Technical specifications for centrifugal pumps