Knowledge Base › Fluid Systems Error Case › Clogged Element, Bypass Open, System Contaminated

Clogged Element, High Δp, Bypass Open, System Contaminated

E44-070 · Filter Clogging and Contamination · Hydraulic Return-Line Filter · ★★

Problem Description

The clogged element drove Δp to 0.5MPa, the bypass valve opened, unfiltered oil entered the system, and the servo valve stuck.

Root Cause

[Bypass] The element clogged and Δp exceeded the setting; the bypass opened and fed dirty oil straight into the supply.
\n[Calculation] Δp of 0.5MPa exceeded the 0.35MPa bypass setting, and 100% of the flow was unfiltered oil.
\n[Design Omission] No Δp alarm and no scheduled element replacement; the bypass caused contamination.

Corrective Solution

1) Fit a Δp alarm and replace elements on schedule; with Δp at 0.5MPa exceeding the 0.35MPa bypass setting, the alarm prompts replacement so the bypass never opens and dirty oil never enters the system;
\n2) Choose elements with high dirt-holding capacity to extend the interval; a larger capacity slows the Δp rise and lengthens replacement intervals, reducing the chance of bypass opening;
\n3) Fit a duplex filter for online switch-over; when one element clogs, switch to the other without shutdown, so filtration is continuous with zero bypass contamination;
\n4) Monitor oil particle count (NAS class) online; servo valves are particle-sensitive and particle count quantifies contamination, so replacement is decided by data;
\n5) Change oil periodically and filter the new oil; used oil carries wear particles, so fresh, finely filtered oil cuts contamination at source and protects the servo valve;
\n6) Add a fine filter before the servo valve (β≥200); the fine stage catches particles that slip past the bypass and protects the valve spool, giving a double safeguard;
\n7) Verify contamination reaches NAS requirements during commissioning; contamination causes valve sticking and acceptance must be measured, confirming system cleanliness;
\n8) Make the element-replacement interval a mandatory maintenance item; the lack of scheduled replacement caused the bypass contamination, so the interval is controlled at the maintenance stage.

Checklist

Reference

GB/T 3766-2015 Hydraulic fluid power — General technical requirements