E44-496 · Filter Blockage and Fouling · Beer Diatomaceous-Earth Filter · ★★
Precoat layer uneven, breakthrough leak, turbidity 5NTU > 0.5, beer hazy
[Mechanism] Improper precoat flow rate makes the layer uneven and it breaks through.
[Calculation] Precoat v >6m/h cracks the layer, causes breakthrough holes, outlet turbidity 5.
[Design Omission] No precoat flow control and no layer inspection; leak results.
1) Control precoat flow rate to 3m/h to keep the layer even, because the original >6 cracking and turbidity 5 caused the leak, so flow control protects the layer;
2) Vent all air before precoating to prevent sloughing, because air causes sloughing, so venting is used;
3) Online outlet turbidity, because breakthrough is detectable, so monitoring is provided;
4) Inspect filter elements regularly to prevent cracking, because cracks leak, so elements are inspected;
5) Optimize diatomaceous-earth grading, because poor grading makes an uneven layer, so grading is optimized;
6) Hold pressure after precoating to prevent erosion, because surge breaks the layer, so pressure is held;
7) Record each batch's precoat, because food use requires traceability, so records are kept;
8) Write precoating into the brewery specification, because the lack of control was the root cause of the leak, so the brewery spec governs.
GB/T 26114-2010 Liquid filters - Filters for filtration