E44-702 · Hydraulic System Contamination and Crawling · Accumulator · ★★
Nitrogen loss, pressure drop
[Mechanism] Nitrogen precharge loss causes a pressure drop.
[Calculation] The loss of precharge causes the pressure to drop.
[Design Omission] No precharging, no inspection, and no pressure control - a design defect leading to gas loss.
1) Recharge nitrogen to the specified precharge (8MPa precharge, calibrated gauge); the original loss defeated pulsation absorption and caused the pressure drop, so recharging restores pressure;
2) Inspect the charging valve to prevent leakage (replace the valve seat, tighten); oil leakage causes gas loss, so inspect and seal to hold pressure;
3) Calibrate the precharge pressure (compare with design, adjust any deviation); deviation leads to loss, so calibration keeps it accurate and stable;
4) Select a temperature-resistant bladder (fluororubber, volume change ≤5%); changing operating conditions cause loss, so temperature-resistant material keeps the volume stable;
5) Control temperature to prevent volume change (≤60℃); changing operating conditions cause loss, so temperature control keeps the capacity stable;
6) Monitor pressure condition (sensor; report any drop); gradual loss is invisible, so monitoring catches it early for early warning;
7) Schedule monthly nitrogen precharge inspection (record pressure); gradual loss is invisible, so scheduled inspection makes it measurable;
8) Write nitrogen recharge and valve inspection into the maintenance card (nitrogen recharge record); since lack of recharging was the root cause of loss, closing the loop in the maintenance card gives maintenance control.
GB/T 23661-2009 Hydraulic cylinders