MOULDLKnowledge Base3D Model DownloadsMembership
中文版Model Store »
HomeModels
Table of contents

Knowledge Base Home

📐 Standard Data

🧮 Calculators

📖 Selection Guides

🏭 Material Grades

❓ Engineer FAQ

🗂 Quick-Reference Categories

❌ Error Case Studies

📚 Technical Articles

Knowledge Base › Fluid Systems Error Case › Plugged Impulse Line on DP Level Transmitter

Plugged Impulse Line on DP Level Transmitter

E44-612 · Level Control Failure · DP Level Transmitter Impulse Line · ★★★

Problem Description

Full-scale reading, plugging

Root Cause

[Mechanism] A plugged impulse line loses the pressure transfer.
[Calculation] The plugging drives the reading to full scale.
[Design Omission] No purging, no isolation, and no inspection were provided, so the line plugged.

Corrective Solution

1) Provide impulse-line purging (instrument air 0.1MPa, continuous purge flow 0.5Nm³/h), because the original impulse line (bore Φ10) was plugged solid by crystallized media or slurry, interrupting the pressure transfer and driving the reading to full scale (e.g., 20kPa), while purging keeps it clear, thereby restoring the pressure transfer and returning the reading to the true liquid column;
2) Add a seal pot (volume 2L, filled with seal fluid of density 1.2) to isolate the media, because dirty media entering the line directly plugs it and the seal fluid isolates the solids, thereby preventing plugging at the source;
3) Blow down regularly to clear plugging (blow down once per shift, valve open 5s), because accumulating deposits plug the line and regular blowdown clears them, thereby keeping the line open;
4) Choose a larger impulse-line bore (increase from Φ10 to Φ15), because a small bore deposits and plugs easily and a larger bore lowers the velocity and reduces deposition, thereby lowering the plugging rate;
5) Heat-trace against congealing (steam tracing ≥80℃), because congealing media (e.g., asphalt) set and plug in the line and tracing keeps them flowing, thereby preventing congealing;
6) Calibrate the zero reading (compare with the local gauge glass, error ≤0.5%), because plugging drives the full-scale deviation and calibration corrects it, thereby confirming the true value;
7) Check for plugging at intervals (purge and check the line weekly), because plugging is gradual and periodic checking prevents full-scale readings, thereby giving early warning;
8) Write the purging and isolation into the maintenance card, because the omitted purging and isolation were the root cause of the plugging and freezing them into the maintenance card enforces maintenance.

Checklist

Reference

GB/T 17614.1-2008 Transmitters for use in industrial-process control systems

Related model download:Understood the principle and ready to try?Go to MOULDL to download related 3D models and CAD drawings for free »
MOULDL · Mechanical Engineering Knowledge Base · free self-study reference for machine designers, 3D CAD models at MOULDL