E45-054 · Cables and Drag Chains · Multi-Core Drag Chain Knotting · ★★★
The cables in the drag chain were not dressed properly and tangle into knots; operation seizes, 3 cores are torn off and the equipment goes into emergency stop
[Mechanism] Several cables enter the chain without layering or dressing, so during reciprocation they twist relative to one another and knot; at the knot the curvature changes sharply and the concentrated stress tears the cores off.
[Calculation] At the knot the local bend radius approaches 0, so the strain exceeds 100% and the core breaks immediately; the seizure also makes the traction force exceed the tensile strength.
[Design Omission] The cables were not layered and dressed, each cable's position was not fixed, and no trial run was made to unpick tangles.
① Layer and dress: layer the cables with separators before they enter the chain and dress them without overlap → prevents tangling
② Fix positions: position each cable in the mounting brackets at both ends → no relative rotation
③ Trial run: run a dry cycle after installation to unpick tangles → confirm no knots
④ Institutionalize: make the dressing procedure a mandatory item in the installation card → drawing gatekeeping
⑤ Seizure test: check during operation whether the chain jams → confirm by measurement
⑥ Separation: use a fully separated drag chain → addresses the root cause of tangling
⑦ Inspection: check monthly for tangling → catch progressive tangling early
⑧ Maintenance: add to the monthly check list → inspect periodically
JB/T 11725-2013 Technical requirements for drag chains