E46-108 · Assembly Sequence & Datum · Locating Pin Joint · ★★
The locating pin holes were reamed first and then match-drilled; after separation the pin holes in the two parts were 0.3mm out of line and the pin could not be inserted on reassembly.
[Mechanism] For match-machined pin holes the assembled pair should be reamed first and the mating part then drilled from it; the reversed order makes the holes non-coaxial.
[Calculation] The 0.3mm offset exceeds the 0.01mm pin-to-hole clearance and the pin jams.
[Design gap] The sequence of reaming the datum part first and then match-drilling the mating part was not specified.
① Ream the datum part first: ream the pin hole in the datum part and fit a process pin for location
② Match-drill the mating part: drill the mating part using the pin hole in the datum part as a guide to ensure coaxiality
③ Ream together: after fitting the two parts ream them together so the pin holes match exactly
④ Match the pin: select a transition-fit pin according to the reamed hole diameter to ensure locating accuracy
⑤ Mark before separation: mark the mating faces before separation to prevent wrong assembly
⑥ In-process inspection: check the pin hole coaxiality after match drilling to detect offset early
⑦ Quality verification: confirm the hole positions are correct by the pin going in easily
⑧ Standardize process: write the pin hole match-machining sequence into the process specification, controlling at the source
GB/T 117-2000 Taper pins