E46-113 · Assembly Sequence & Datum · Mold Closing · ★★
The two mold halves were located only by tightening the bolts; the 0.5mm misalignment made the flash on the molded parts thick and repeated disassembly could not correct it.
[Mechanism] Without driving the locating pins first to fix the relative position, relying only on the bolts for location invites misalignment.
[Calculation] The 0.5mm misalignment exceeds the 0.05mm mold-closing tolerance and the flash is excessive.
[Design gap] The sequence of pin location first and bolt tightening afterward was not provided.
① Pin before bolt: align the two mold halves precisely with locating pins first, then tighten the bolts
② Match-machine the pin holes: after closing the two halves, drill and ream the pin holes together to ensure a transition fit between pin and hole
③ Select the pin type: locate with a taper pin or cylindrical pin, fit accuracy IT7
④ Clean the joint face: before closing, clean the joint face of burrs and foreign matter to ensure contact
⑤ Re-measure alignment: after driving the pins measure the misalignment and confirm it is ≤0.05mm
⑥ In-process inspection: check the misalignment during tightening and detect it early
⑦ Quality verification: confirm alignment by the flash thickness on trial-molded parts
⑧ Standardize process: write pin-before-bolt into the assembly process, controlling at the source
GB/T 117-2000 Taper pins