E46-131 · Assembly Sequence & Datum · Disc Spring Stack · ★★
The disc spring stack had its pressure plate tightened before pre-compression, so the springs were fully collapsed with no cushioning, and the connecting parts broke when the equipment was shocked.
[Mechanism] The disc spring stack should be assembled to the specified pre-compression first and the pressure plate locked afterward; the reversed order collapses the springs.
[Calculation] A fully collapsed stack has effectively infinite stiffness, so the impact load is carried entirely by the bolts, which break.
[Design gap] The pre-compression amount and direction were not specified.
① Follow the pre-compression: pre-compress the spring stack by the amount on the drawing, e.g. total height minus 2mm, then lock the pressure plate
② Control the direction: stack the disc springs with the small conical faces facing each other or in the same direction as required, all oriented alike
③ Measure the height: after assembly measure the free height and the compressed height of the spring stack to confirm the pre-compression
④ Select washers: add flat washers to distribute the pressure and prevent offset loading
⑤ Re-check the springback: release the pressure plate and measure the springback to confirm normal elasticity
⑥ In-process inspection: check the spring orientation during assembly to detect reversed installation early
⑦ Quality verification: confirm the cushioning characteristics are acceptable by a pressure test
⑧ Standardize process: write the pre-compression amount and direction into the work instruction, controlling at the source