E46-181 · Fastening & Anti-Loosening · Reactor flange · ★★★
During hydraulic tensioning the operator misread the dial indicator, taking an out-of-spec elongation as acceptable; the bolt preload was insufficient and the flange leaked after heat-up.
[Mechanism] The tensioning method controls preload by measured elongation; a reading error leaves the actual elongation below design and the preload insufficient.
[Calculation] Preload F=E·A·δ/L; if δ is read low, F is proportionally low and falls below the minimum compression force needed for sealing.
[Design gap] Two-person reading and cross-checking were not enforced; one person recorded from impression.
① Two-person reading: during tensioning, two people read the gauge separately and cross-check; if the difference exceeds the limit, re-measure
② Calibrate the gauge: calibrate the dial indicator or elongation sensor before use to ensure accuracy
③ Set a lower-limit alarm: fit the tensioner with a digital display that alarms and holds pressure until the set elongation is reached
④ Record at source: record each bolt's elongation on the spot to avoid filling it in afterwards
⑤ Re-measure and sample: after all are done, re-measure several to confirm the average meets spec
⑥ Train the operators: tensioning operators must be trained and certified
⑦ Elongation verification: confirm the design value is reached by re-checking the measured elongation
⑧ Standardize process: write two-person reading and recording into the tensioning work instruction
GB/T 1231-2006 High-strength large hexagon head bolts for steel structures