After the equipment was set in place and the anchor bolts were tightened, the secondary grouting was not dense, leaving voids between the foundation and the base; operating vibration separated the base from the foundation and the bolts loosened under impact.
[Mechanism] Grouting voids leave parts of the base unsupported, concentrating load on the anchor bolts; under vibration the bolts take impact while the foundation carries no load.
[Calculation] The voids reduce the base's support area, the anchor bolts take additional bending, and loosening accelerates.
[Design gap] Before grouting, the holes were not cleaned and wetted, and the grout was not vibrated to full density.
① Clean and wet: before grouting, clear debris from the foundation surface and the holes and wet them with water
② Choose the grout: use non-shrink high-strength grout to ensure dense filling
③ Vibrate to full density: vibrate during grouting to expel air bubbles and leave no voids
④ Cure properly: after grouting, keep it moist until it reaches the specified strength, then tighten the bolts
⑤ Check density: after curing, tap for sound or drill core samples to confirm no hollow spots
⑥ Tighten in stages: final-tighten the anchor bolts only after the foundation reaches strength
⑦ Grouting verification: confirm density by tapping with no hollow sound
⑧ Standardize process: write grouting hole cleaning, vibrating, and curing into the foundation construction specification
GB/T 50448-2015 Technical code for application of cementitious grouts