E46-390 · Surface Treatment & Coating · Coated part · ★
The coating was only surface-dry, not fully cured, and got pressed and stuck off; handling too early while the film was soft damaged the surface.
[Mechanism] Handling before full cure leaves the film soft, and it sticks and peels under pressure.
[Calculation] Epoxy needs 7 days to fully cure at 25℃; handling too early damages it.
[Design gap] Handling before full cure was not prohibited.
① Control full cure: prohibit handling before full cure to protect the film
② Control the environment: use a suitable temperature to speed curing
③ Stand upright: stand parts upright to reduce contact and prevent sticking
④ Full-cure check: finger-touch test for hardness to detect problems early
⑤ Re-coat: sand and re-coat sticking-damaged parts to restore the surface
⑥ Separate: put spacers between parts to prevent contact sticking
⑦ Full-cure verification: confirm adequate cure by hardness, confirmed by data
⑧ Standardize process: write the handling prohibition into post-coating, controlling at the source
GB/T 30790.1-2014 Paints and varnishes - Protective coating systems